Line 26: |
Line 26: |
| | | |
| [https://docs.google.com/spreadsheets/d/1Lo9PNANkkx4Dl1Sy7DjJ_oA8nAStV7FFLykrrypabKM/edit?usp=sharing * CLICK TO VIEW CURRENT STATUS OF ALL LASER SYSTEMS] * | | [https://docs.google.com/spreadsheets/d/1Lo9PNANkkx4Dl1Sy7DjJ_oA8nAStV7FFLykrrypabKM/edit?usp=sharing * CLICK TO VIEW CURRENT STATUS OF ALL LASER SYSTEMS] * |
− |
| |
− |
| |
− | OLD NEWS
| |
− |
| |
− | * (2020/09/18) Head crash caused some alignment issues. Currently OOO. Parts are on the way, plus beam intensity meter.
| |
− | * (2020/Febrary) New 150W tube installed & aligned. BOSS working well.
| |
− | * (2019/07/25) Beam Combiner installed; Mirrors and Red beam aligned. Red dot is slightly left (about 3/4 of a dot) of actual cut. A few more parts needed, but the Boss is operational.
| |
− | * (2019/06/26) Working, 4-in Len replaced by Joe M. Still waiting on Beam Combiner.
| |
− | * (2019/06/15) Working, 4-in Lens is cracked from overtightening -- DO NOT CLEAN --; Mirrors aligned. Beam Combiner and replacement lens on order.
| |
− | * (2018/12/07) Working, but not that well. Had to use 100% power and speed 5 to cut through relatively thin leather. Perhaps needs to be cleaned?
| |
− | * (2018/12/01) NOT working. Needs a tube replacement, probably. It's going to be a while. It will not happen faster if you ask when it's going to be fixed. NOBODY KNOWS YET.
| |
− | * (2018/02/26) Working. Z-Axis motor having some issues? 2-25-2018
| |
− | * (2017/05/20) 150W Tube & Power Supply installed. Alignment & focusing pending.
| |
− | * (2017/06/12) The laser has been aligned and focused. 2" Laser lens focal depth set to 5.1mm.
| |
| | | |
| == Software == | | == Software == |
Line 63: |
Line 49: |
| The laser volunteers will be notified automatically after the form is submitted. You will then be contacted when the next authorization is scheduled. (approx. every 2 weeks at the authorizers discretion) | | The laser volunteers will be notified automatically after the form is submitted. You will then be contacted when the next authorization is scheduled. (approx. every 2 weeks at the authorizers discretion) |
| | | |
− | If no authorizations are scheduled in the next 30 days, then post on the Google Group email list or #lasers slack channel; look for a recent thread about laser authorizations and post there. | + | If no authorizations are scheduled in the next 30 days, then post on #lasers slack channel; look for a recent thread about laser authorizations and post there. |
| | | |
| Please review the wiki and the reference materials before attending an authorization. | | Please review the wiki and the reference materials before attending an authorization. |