Difference between revisions of "2015 Budget Vote/General Area Budget"

From Pumping Station One
Jump to navigation Jump to search
Line 1: Line 1:
 
[[2015_Budget_Vote | Back to 2015 Budget Vote]]
 
[[2015_Budget_Vote | Back to 2015 Budget Vote]]
 +
 +
== Account Breakdown ==
 +
 +
Prepared by: Justin T. Conroy
 +
 
{|
 
{|
|Area Budget Proposal
+
!Account
|
+
!Monthly
|
+
!Annual
|
+
!Annual Total
|
 
|----
 
|
 
|
 
|
 
|
 
|
 
|----
 
|Area:
 
|General Area
 
|
 
|
 
|
 
|----
 
|Prepared by:
 
|Justin T. Conroy
 
|
 
|
 
|
 
|----
 
|
 
|
 
|
 
|
 
|
 
|----
 
|Account Breakdown
 
|
 
|
 
|
 
|
 
|----
 
|
 
|Expenses
 
|
 
|
 
|
 
|----
 
|Account
 
|Monthly
 
|Annual
 
|Annual Total
 
|
 
 
|----
 
|----
 
|Advertising
 
|Advertising
Line 53: Line 15:
 
| $ -   
 
| $ -   
 
| $ -   
 
| $ -   
|
 
 
|----
 
|----
 
|Disposal Fees
 
|Disposal Fees
Line 59: Line 20:
 
| $ -   
 
| $ -   
 
| $ -   
 
| $ -   
|
 
 
|----
 
|----
 
|Education
 
|Education
Line 65: Line 25:
 
| $ -   
 
| $ -   
 
| $ -   
 
| $ -   
|
 
 
|----
 
|----
 
|Equipment
 
|Equipment
Line 71: Line 30:
 
| $ 550.00  
 
| $ 550.00  
 
| $ 550.00  
 
| $ 550.00  
|
 
 
|----
 
|----
 
|Furniture
 
|Furniture
Line 77: Line 35:
 
| $ 300.00  
 
| $ 300.00  
 
| $ 300.00  
 
| $ 300.00  
|
 
 
|----
 
|----
 
|Job Materials
 
|Job Materials
Line 83: Line 40:
 
| $ 1,700.00  
 
| $ 1,700.00  
 
| $ 1,700.00  
 
| $ 1,700.00  
|
 
 
|----
 
|----
 
|Office Expenses
 
|Office Expenses
Line 89: Line 45:
 
| $ -   
 
| $ -   
 
| $ -   
 
| $ -   
|
 
 
|----
 
|----
 
|Repair & Maintenance
 
|Repair & Maintenance
Line 95: Line 50:
 
| $ 300.00  
 
| $ 300.00  
 
| $ 1,020.00  
 
| $ 1,020.00  
|
 
 
|----
 
|----
 
|Safety Equipment
 
|Safety Equipment
Line 101: Line 55:
 
| $ 250.00  
 
| $ 250.00  
 
| $ 250.00  
 
| $ 250.00  
|
 
 
|----
 
|----
 
|Supplies
 
|Supplies
Line 107: Line 60:
 
| $ 1,231.00  
 
| $ 1,231.00  
 
| $ 2,911.00  
 
| $ 2,911.00  
|
 
 
|----
 
|----
 
|Tools
 
|Tools
Line 113: Line 65:
 
| $ -   
 
| $ -   
 
| $ -   
 
| $ -   
|Total Budget Required
 
 
|----
 
|----
 
|Total
 
|Total
 
| $ 200.00  
 
| $ 200.00  
 
| $ 4,331.00  
 
| $ 4,331.00  
| $ 6,731.00
 
 
| $ 6,731.00  
 
| $ 6,731.00  
 
|----
 
|----
 
|}
 
|}
 +
 +
Total Budget Required:  $ 6,731.00
 +
 +
== Equipment ==
  
 
{|
 
{|
Line 150: Line 104:
 
|----
 
|----
 
|}
 
|}
 +
 +
== Furniture ==
  
 
{|
 
{|
Line 173: Line 129:
 
|----
 
|----
 
|}
 
|}
 +
 +
 +
== Job Materials ==
  
 
{|
 
{|
Line 201: Line 160:
 
|----
 
|----
 
|}
 
|}
 +
 +
== Repair and Maintenance ==
  
 
{|
 
{|
Line 234: Line 195:
 
|----
 
|----
 
|}
 
|}
 +
 +
== Repair and Maintenance ==
  
 
{|
 
{|
Line 267: Line 230:
 
|----
 
|----
 
|}
 
|}
 +
 +
== Supplies ==
  
 
{|
 
{|

Revision as of 05:33, 15 January 2015

Back to 2015 Budget Vote

Account Breakdown

Prepared by: Justin T. Conroy

Account Monthly Annual Annual Total
Advertising $ - $ - $ -
Disposal Fees $ - $ - $ -
Education $ - $ - $ -
Equipment $ - $ 550.00 $ 550.00
Furniture $ - $ 300.00 $ 300.00
Job Materials $ - $ 1,700.00 $ 1,700.00
Office Expenses $ - $ - $ -
Repair & Maintenance $ 60.00 $ 300.00 $ 1,020.00
Safety Equipment $ - $ 250.00 $ 250.00
Supplies $ 140.00 $ 1,231.00 $ 2,911.00
Tools $ - $ - $ -
Total $ 200.00 $ 4,331.00 $ 6,731.00

Total Budget Required: $ 6,731.00

Equipment

Equipment
Description Large Long Lived Equipment
Equipment Name Equipment Description Annual Cost Monthly Cost
Wheel Truing Stand For the Bike area to true bike wheels $350.00
Game things Buy systems that we have peripherals and games for, but the actual consoles missing, upgrade game library in general $200.00

Furniture

Furniture
Description Costs of furniture for the area
Item Description Annual Cost Monthly Cost
Tables New Tables for the lounge $300.00


Job Materials

Job Materials
Description Costs of materials required to improve the area
Item Name Item Description Annual Cost Monthly Cost
Cabinet/Counter/Shelves Materials to build those things to hold the analog and digital games of PS1. $600.00
New Walls in the Lounge New drywall to put over the currently bare cinder block walls. $1,100.00

Repair and Maintenance

Repair and Maintenance
Description Costs for planned and unplanned repairs to tools in the area
Repair Name Repair Description Annual Cost Monthly Cost
General Repairs Simple Repairs around the space that don't require a professional $ 60.00
Vacuum Pump Oil 4x 1L bottles Edwards Ultragrade 19, needed in 4Q 2015 $ 150.00
Vacuum Pump Oil Odor Filters 5x Carbon Odor Filters, needed in 4Q 2015 $ 150.00

Repair and Maintenance

Repair and Maintenance
Description Costs for planned and unplanned repairs to tools in the area
Repair Name Repair Description Annual Cost Monthly Cost
General Repairs Simple Repairs around the space that don't require a professional $ 60.00
Vacuum Pump Oil 4x 1L bottles Edwards Ultragrade 19, needed in 4Q 2015 $ 150.00
Vacuum Pump Oil Odor Filters 5x Carbon Odor Filters, needed in 4Q 2015 $ 150.00

Supplies

Supplies
Description Cost of consumables (drillbits/grinding wheels/ink/fillament)
Item Name Item Description Annual Cost Monthly Cost
Paper Towels $487.00
Trash bags/cans $50.00
Mops and mop accessories bucket $66.00
General purpose cleaner $22.00
Soap $72.00
Safety-first aid first aid kits $450.00
Toilet paper $356.00
Brooms $15.00
Shop Towels $200.00
Liquid Nitrogen 1 dewar fill per month. $40.00
Sample Prep Supplies Sample stubs, storage boxes, carbon tape, etc. $25.00
Laser Toner Cartridges black, cyan, magenta, yellow cartridges $45.00
laser copier / printer paper $30.00