2015 Budget Vote/General Area Budget

From Pumping Station One
Revision as of 04:33, 15 January 2015 by Bry (talk | contribs) (Created page with "{| |Area Budget Proposal | | | | |---- | | | | | |---- |Area: |General Area | | | |---- |Prepared by: |Justin T. Conroy | | | |---- | | | | | |---- |Account Breakdown | | | |...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Area Budget Proposal
Area: General Area
Prepared by: Justin T. Conroy
Account Breakdown
Expenses
Account Monthly Annual Annual Total
Advertising $ - $ - $ -
Disposal Fees $ - $ - $ -
Education $ - $ - $ -
Equipment $ - $ 550.00 $ 550.00
Furniture $ - $ 300.00 $ 300.00
Job Materials $ - $ 1,700.00 $ 1,700.00
Office Expenses $ - $ - $ -
Repair & Maintenance $ 60.00 $ 300.00 $ 1,020.00
Safety Equipment $ - $ 250.00 $ 250.00
Supplies $ 140.00 $ 1,231.00 $ 2,911.00
Tools $ - $ - $ - Total Budget Required
Total $ 200.00 $ 4,331.00 $ 6,731.00 $ 6,731.00
Equipment
Description Large Long Lived Equipment
Equipment Name Equipment Description Annual Cost Monthly Cost
Wheel Truing Stand For the Bike area to true bike wheels $350.00
Game things Buy systems that we have peripherals and games for, but the actual consoles missing, upgrade game library in general $200.00
Furniture
Description Costs of furniture for the area
Item Description Annual Cost Monthly Cost
Tables New Tables for the lounge $300.00
Job Materials
Description Costs of materials required to improve the area
Item Name Item Description Annual Cost Monthly Cost
Cabinet/Counter/Shelves Materials to build those things to hold the analog and digital games of PS1. $600.00
New Walls in the Lounge New drywall to put over the currently bare cinder block walls. $1,100.00
Repair and Maintenance
Description Costs for planned and unplanned repairs to tools in the area
Repair Name Repair Description Annual Cost Monthly Cost
General Repairs Simple Repairs around the space that don't require a professional $ 60.00
Vacuum Pump Oil 4x 1L bottles Edwards Ultragrade 19, needed in 4Q 2015 $ 150.00
Vacuum Pump Oil Odor Filters 5x Carbon Odor Filters, needed in 4Q 2015 $ 150.00
Repair and Maintenance
Description Costs for planned and unplanned repairs to tools in the area
Repair Name Repair Description Annual Cost Monthly Cost
General Repairs Simple Repairs around the space that don't require a professional $ 60.00
Vacuum Pump Oil 4x 1L bottles Edwards Ultragrade 19, needed in 4Q 2015 $ 150.00
Vacuum Pump Oil Odor Filters 5x Carbon Odor Filters, needed in 4Q 2015 $ 150.00
Supplies
Description Cost of consumables (drillbits/grinding wheels/ink/fillament)
Item Name Item Description Annual Cost Monthly Cost
Paper Towels $487.00
Trash bags/cans $50.00
Mops and mop accessories bucket $66.00
General purpose cleaner $22.00
Soap $72.00
Safety-first aid first aid kits $450.00
Toilet paper $356.00
Brooms $15.00
Shop Towels $200.00
Liquid Nitrogen 1 dewar fill per month. $40.00
Sample Prep Supplies Sample stubs, storage boxes, carbon tape, etc. $25.00
Laser Toner Cartridges black, cyan, magenta, yellow cartridges $45.00
laser copier / printer paper $30.00