Difference between revisions of "2017 Woodshop Area Budget Vote"

From Pumping Station One
Jump to navigation Jump to search
Line 11: Line 11:
  
 
== Background ==
 
== Background ==
 +
Background
 +
The woodshop area is seeking $9000 for the next fiscal year (FY 2017-18). This amount is to cover the following four major areas of concern:
 +
• Completing the expansion of the woodshop area to the new space (new workbenches, dust collection storage for example)
 +
• Many of the existing hand tools are either marginally functional or in poor condition. In 2017 I would like to begin replacing these tools with higher quality and more durable equipment.
 +
• Consumables (Bits, Blades, sand paper, adhesives, fasteners, etc) Much of these expense were covered in the tool cage budget last year and will be absorbed into the woodshop
 +
• Materials for authorizations
 +
 +
Item Amount
 +
New Tool Purchases $4,000
 +
Maintenance $1,000
 +
Consumables $2,000.
 +
Shop Furniture $1,500
 +
Authorization materials $500
 +
 +
  
  
 
== Language ==
 
== Language ==
Authorize the board to spend up to $X to cover Woodshop Area expenditures for the fiscal year of 2017. The board may assign this spending authority to the area host. This spending authorization goes into effect 2017-01-01 and expires 2017-12-31.
+
Authorize the board to spend up to $9000 to cover Woodshop Area expenditures for the fiscal year of 2017. The board may assign this spending authority to the area host. This spending authorization goes into effect 2017-01-01 and expires 2017-12-31.
  
 
== Vote ==
 
== Vote ==

Revision as of 05:57, 15 December 2016

Back to 2017 Budget.

Sponsors

History

  • Mailing List Announcement: ???
  • Officially Proposed: ???
  • Voted on: ???

Background

Background The woodshop area is seeking $9000 for the next fiscal year (FY 2017-18). This amount is to cover the following four major areas of concern: • Completing the expansion of the woodshop area to the new space (new workbenches, dust collection storage for example) • Many of the existing hand tools are either marginally functional or in poor condition. In 2017 I would like to begin replacing these tools with higher quality and more durable equipment. • Consumables (Bits, Blades, sand paper, adhesives, fasteners, etc) Much of these expense were covered in the tool cage budget last year and will be absorbed into the woodshop • Materials for authorizations

Item Amount New Tool Purchases $4,000 Maintenance $1,000 Consumables $2,000. Shop Furniture $1,500 Authorization materials $500



Language

Authorize the board to spend up to $9000 to cover Woodshop Area expenditures for the fiscal year of 2017. The board may assign this spending authority to the area host. This spending authorization goes into effect 2017-01-01 and expires 2017-12-31.

Vote

  • Quorum:
  • Yay:
  • Nay:
  • Abstain: