Difference between revisions of "Area Improvements and Projects"
Jump to navigation
Jump to search
Rtystgeeke (talk | contribs) |
Rtystgeeke (talk | contribs) |
||
Line 12: | Line 12: | ||
==Hot Metals Area== | ==Hot Metals Area== | ||
− | + | *Exhaust gas ventilation to outside for plasma cutter and welders. | |
− | *Exhaust gas ventilation to outside | ||
− | |||
==Cold Metals Area== | ==Cold Metals Area== |
Revision as of 14:48, 8 October 2017
General Area
- Paint the back stairwell railings, main doorways.
- Upgrade cable runs throughout the space to open cable raceways.
- Clean up/reorganize the safe.
CNC Area
- Crimp cables and metal tags/labels to all calipers
Electronics Area
Arts Area
Hot Metals Area
- Exhaust gas ventilation to outside for plasma cutter and welders.
Cold Metals Area
- Emerson/Sears mini band saw
- Replace motor and pulley
- Fix switch
- Setup for cutting thing metal / tube stock etc
Wood Shop Area
- Add dust collection drop for new planer. May need to order elbows, 6" blast gate, 6" flanges.
- Add floor sweep inlet for the dust collector
Tool Cage Area
Kitchen Area
- Add sliding door to kitchen (check fire codes)
- Seal gap between catwalk and wall.