Area Improvements and Projects

From Pumping Station One
Jump to navigation Jump to search

General Area

  • Paint the back stairwell railings, main doorways.
  • Fix the Tardis
  • Fix the ventilation fan in the shop that doesn't spin up.
  • Paulk workbench as a uniform replacement for tables around PS1. https://www.youtube.com/watch?v=KnNi6Tpp-ac Some features of this bench are not applicable, such as the tablesaw mount and perhaps the router table option. Creating a CAD version of the design would speed up the construction.
  • Replace the orange table in the middle of the shop (it's becoming unstable)
  • Tidy Space stuff under the orange table
  • Replace dust collector impeller shroud clips as they all have hairline fractures
  • Upgrade cable runs throughout the space to open cable raceways.
  • Load cell sensor to monitor dust collector bin with alerts and automatic shutoff when its full
  • Clean up/reorganize the safe.

CNC Area

  • Move dust collection elbow so that it doesn't pass over the light in the shop, and the tube doesn't stretch to reach the home corner
  • Put up Lexan sheet on the right side opening of the new desk.
  • Build a spool rack that holds all filament spools above the 3D printers.
  • Plane and glue 2 sheets of MDF to the Shopbot wasteboard .
  • Crimp cables and metal tags/labels to all calipers

Electronics Area

Crafts Area

Hot Metals Area

  • Flip middle limbo wall to create storage for Hot Metals.
  • Exhaust gas ventilation to outside.
  • Acquire and install wall mounted compressed air hose real near and for use with the plasma cutter.

Cold Metals Area

  • Emerson/Sears mini band saw
    • Replace motor and pulley
    • Fix switch
    • Setup for cutting thing metal / tube stock etc

Wood Shop Area

  • Add dust collection drop for new planer. May need to order elbows, 6" blast gate, 6" flanges.
  • Add floor sweep inlet for the dust collector

Tool Cage Area

Kitchen Area

  • Add sliding door to kitchen (check fire codes)
  • Seal gap between catwalk and wall.