Changes

Jump to navigation Jump to search
no edit summary
Line 63: Line 63:  
# Insert sheet of material into Frame
 
# Insert sheet of material into Frame
 
# Close the frame latch to the secure the material
 
# Close the frame latch to the secure the material
# Secure Mold to Vacuum table
+
# Secure Buck/Form/Mould to Vacuum table
 
# Check seals around material and mold
 
# Check seals around material and mold
 
|-
 
|-
Line 98: Line 98:  
|
 
|
 
# Pull Material frame forward
 
# Pull Material frame forward
# Inspect Plastic is ready
+
# Inspect Plastic is ready (sufficiently heated/soft)
# push level to raise vacuum bed
+
# push lever to raise vacuum bed
 
# Open Vacuum Valve
 
# Open Vacuum Valve
 
# Monitor pull of material over mold
 
# Monitor pull of material over mold
Line 105: Line 105:  
|  
 
|  
 
# Turn off Vacuum
 
# Turn off Vacuum
# Turn off Heater
+
# Allow part part to sufficient time cool. This is dependent on the thickness of your material.
 +
|-
 +
|
 +
'''Shutdown Procedure'''
 +
# Turn off Heater.
 
# Disconnect pneumatic hose. Return to CNC Plasma Cutter.
 
# Disconnect pneumatic hose. Return to CNC Plasma Cutter.
 +
# Turn off machine power.
 +
# Turn off Main Wall power.
 +
|-
 +
|
 +
'''Cleanup Procedure'''
 +
# Cleanup any unused material or scrap.
 +
# Throw away failed part pulls in dumpster. Do not leave in Hot Metals area.
     
150

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu