Changes

Jump to navigation Jump to search
no edit summary
Line 63: Line 63:  
# Insert sheet of material into Frame
 
# Insert sheet of material into Frame
 
# Close the frame latch to the secure the material
 
# Close the frame latch to the secure the material
 +
# Push bar forward to close frame clamps and secure overall frame.
 
# Secure Buck/Form/Mould to Vacuum table
 
# Secure Buck/Form/Mould to Vacuum table
 
# Check seals around material and mold
 
# Check seals around material and mold
Line 97: Line 98:  
|-
 
|-
 
|
 
|
# Pull Material frame forward
+
# Pull Material frame forward (towards front/away from heaters)
 
# Inspect Plastic is ready (sufficiently heated/soft)
 
# Inspect Plastic is ready (sufficiently heated/soft)
# push lever to raise vacuum bed
+
# push lever to raise vacuum bed/platen
 
# Open Vacuum Valve
 
# Open Vacuum Valve
 
# Monitor pull of material over mold
 
# Monitor pull of material over mold
150

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu