Changes

Jump to navigation Jump to search
no edit summary
Line 28: Line 28:  
=== Current Status ===
 
=== Current Status ===
   −
This machine is working but requires maintenance and improvements.
+
This machine is working but requires maintenance and improvements (see list below).
    
== Vacuum Forming Process ==
 
== Vacuum Forming Process ==
Line 279: Line 279:  
* Fix platen/frame rubber seals
 
* Fix platen/frame rubber seals
 
* Build basic test mold for demos and training. (PS1 Logo or Mask)
 
* Build basic test mold for demos and training. (PS1 Logo or Mask)
* Move Gauge before valve to measure vacuum
+
* Move vacuum gauge to before the valve, to measures the vacuum the pump is pulling (right now it's after the valve, so doesn't read anything useful)
* Larger Vacuum Tank
+
* Install Additional/Larger Vacuum Tank to the system for more capacity
 
* More powerful Vacuum Pump
 
* More powerful Vacuum Pump
 
* Temperature Monitoring
 
* Temperature Monitoring
* Attach Control Panel to machine
+
* Mount Control Panel Box to machine
 +
* Put on locking casters, or more permanent blocks/skid (machine is very heavy)
 +
* make the platen stationary and the heater roll (complicated)
 +
* Reduce the footprint of the machine (complicated)
    
== Authorizers ==
 
== Authorizers ==
150

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu