Difference between revisions of "Board Meeting Notes 2012-09-04"

From Pumping Station One
Jump to navigation Jump to search
Line 5: Line 5:
 
  | YYYY=2012}}
 
  | YYYY=2012}}
  
Meeting start:  XX:XX pm
+
Meeting start:  7:12 pm
  
 
===Attendance===
 
===Attendance===
  
*  
+
* Tim
 +
* Eric
 +
* Steve
 +
* Dan
  
 
===Agenda===
 
===Agenda===
Line 39: Line 42:
  
 
===Minutes===
 
===Minutes===
 +
 +
* Waste management has been paid.  Ishmael, are we closer to the paid payment or the next payment?
 +
* Ishmael will buy the access control parts for Rhys.
 +
* No inventory yet
 +
* No letter for the security deposit at 3354
 +
* Cleaning service is scheduled, one time for now.  Can schedule repeating in the future.
 +
* We decided that Shellie is the new arts area host
 +
* splitting the shop air is Dan's todo.
 +
* the big compressor is running and in the boiler room.
 +
 +
 +
* build out
 +
** Less concerned about building a welding area because it's less frequent
 +
** more concerned about
 +
*** tool organization
 +
*** ventilation, for fumes or temperature
 +
*** Lighting
 +
*** Separate the kitchen and cnc tools.
 +
** Separating the wood and metal shops are less pressing, not sure how to evaluate how much space it needs permanently. 
 +
** Designate spots for everything in the shop before any major build out
 +
 
   
 
   
 
Meeting End:  XX:XX pm
 
Meeting End:  XX:XX pm

Revision as of 00:56, 5 September 2012


Board Meeting Minutes
<< [[Board Meeting Notes {{{Previous YYYY-MM-DD}}}]] 2012 Board Meetings [[Board Meeting Notes {{{Next YYYY-MM-DD}}}]] >>

Meeting start: 7:12 pm

Attendance

  • Tim
  • Eric
  • Steve
  • Dan

Agenda

Old Business

  • Ishmael
    • Have we paid the bill from Waste Management yet?
    • Buy the stuff Rhys needs for access control.
  • Tim
    • inventory and ownership status of old landlord's stuff left on our side. - NO inventory yet
    • Status of money owed by the old landlord? (Steve's letter formally asking for the deposit back)
  • Patrick
    • Cleaning service
  • Shawn
    • bathroom sinks
  • Unassigned
    • Change address update.
    • We need a new area host for graphic arts / textiles
    • Install shop air valve between our area and Tony's

New Business

  • Financial/membership report

Minutes

  • Waste management has been paid. Ishmael, are we closer to the paid payment or the next payment?
  • Ishmael will buy the access control parts for Rhys.
  • No inventory yet
  • No letter for the security deposit at 3354
  • Cleaning service is scheduled, one time for now. Can schedule repeating in the future.
  • We decided that Shellie is the new arts area host
  • splitting the shop air is Dan's todo.
  • the big compressor is running and in the boiler room.


  • build out
    • Less concerned about building a welding area because it's less frequent
    • more concerned about
      • tool organization
      • ventilation, for fumes or temperature
      • Lighting
      • Separate the kitchen and cnc tools.
    • Separating the wood and metal shops are less pressing, not sure how to evaluate how much space it needs permanently.
    • Designate spots for everything in the shop before any major build out


Meeting End: XX:XX pm