Difference between revisions of "Clausing Lathe maintenance"

From Pumping Station One
Jump to navigation Jump to search
Line 53: Line 53:
 
|x
 
|x
 
|
 
|
|Jan 11, 2011
+
|Jan 11, 2018
 
|Tucker/Zlatan
 
|Tucker/Zlatan
 +
|-
 +
|x
 +
|x
 +
|
 +
|Apr 5, 2018
 +
|Tucker/Daniel
 
|-
 
|-
 
|}
 
|}

Revision as of 04:21, 6 April 2018

The Clausing Lathe, has a very involved maintenance schedule. The lathe should be lubricated daily, or at least as often as it is used. Please refer to the File:4900-Clausing-Brochure.PDF for the correct lubrication instructions. While users are expected to perform basic cleanup and lubrication on a per-use basis, PS1 should, on a monthly basis perform the following maintenance operations:

  • clean
  • oil ways
  • oil internal mechanism according to manual's lubrication instructions
  • adjust gibs


Clausing Lathe maintenance log table

Lubricate lathe per user manual clean/oil ways adjust gibs date completed person completing
monthly monthly monthly
x x Aug3 2017 Tucker/Miriam
x x sept 7 2017 Tucker/Miriam
x x x Oct 5 2017 Tucker
x x Nov 9 2017 Tucker
x x Jan 11, 2018 Tucker/Zlatan
x x Apr 5, 2018 Tucker/Daniel