==TODO==
 
==TODO==
  
* Inlay tiles in the top, laser etched. Need beer church logo first.
 
* Put sides on the bar.
 
* Sand the edges, it's sorta sharp.
 
 
* Screw down the top of the bar; it is loose as is. Could unscrew later if we need to remove it.
 
* Screw down the top of the bar; it is loose as is. Could unscrew later if we need to remove it.
* Finishing (maybe a very light stain - at least urethane). Bar topping epoxy?
+
* Install wood trim
 +
* Build enclosure for fridge
 +
* Move shelf in fridge up so there is more room to tap a Sankey keg underneath
 +
* Upgrade from 2 to 4 taps
 +
* Temperature sensors in fridge and tap line
 +
* Better gas distribution so manifold isn't hanging loose.
 +
* Beverage line locks and RFID controls

Revision as of 01:42, 31 August 2013


Drinking Station: One
Owner/Loaner PS:One
Serial Number N/A
Make/Model N/A
Arrival Date 9/2012
Usability WORKING
Contact Ryan Pierce
Where Lounge
Authorization Needed yes
Hackable NO
Estimated Value $1,200
Host Area {{{hostarea}}}


Drinking Station: One Area: {{{hostarea}}} https://wiki.pumpingstationone.org/wiki/Drinking_Station:_One



Rules

  1. If you aren't certified, don't even open the fridge.
  2. Don't drink all the beer, that's rude. If you're looking to get hammered go buy a 30rack of PBR.
  3. Don't drink the beer if you aren't 21 or older. Just.. come on. Don't.
  4. If beer is on tap, you don't have to be certified to help yourself. Pull forward for beer, push to add head. Please pour water in the drip tray when you're done and empty the bucket under the bar (and very importantly, put it back after).

Further rules later, this is just a start at writing things down about the bar.

How To Clean Taps

TBD upload photos and put them on here, step by step instructions.

Cleaning History

Incomplete.

When Who What
2/24/2013 Eric & James Cleaned tap 1 fully and put Beer 2013.02 on tap 1. Tap 2 is soaking the line in PBW water, since it had yeast caked all of it. Don't use it.
3/6/2013 Eric Took Beer 2013.02 off tap 1 and flushed tap 1 with sanitizer water repeatedly - left sanitizer in line. Tap 2 is soaking the line in PBW water, since it had yeast caked all of it. Tap 1 is good to go, Tap 2 needs more cleaning.
3/24/2013 Eric Took Beer 2013.03 off tap 1 and flushed tap 1 with sanitizer water repeatedly - left sanitizer in line. Tap 2 is soaking the line in PBW water, since it had yeast caked all of it. Tap 1 is good to go, Tap 2 needs more cleaning.
6/4/2013 Matt Triano, Tucker Tomlinson Filled both lines with PBW.

List of Currently Certified Users

Qualified Member Trained By
Ryan Pierce Built draft system
Eric Stein Ryan Pierce

TODO

  • Screw down the top of the bar; it is loose as is. Could unscrew later if we need to remove it.
  • Install wood trim
  • Build enclosure for fridge
  • Move shelf in fridge up so there is more room to tap a Sankey keg underneath
  • Upgrade from 2 to 4 taps
  • Temperature sensors in fridge and tap line
  • Better gas distribution so manifold isn't hanging loose.
  • Beverage line locks and RFID controls