{{NeedsUpdate|Some of this information is from the old location of the dust collector, and some of the details are missing or incorrect.  There is a group working on dust collection needs, performance and recommendations.  
 
{{NeedsUpdate|Some of this information is from the old location of the dust collector, and some of the details are missing or incorrect.  There is a group working on dust collection needs, performance and recommendations.  
   −
we started in October 2018 as interim information is available we will update this wikipage and wherever necessary
+
we started in October 2018as interim information is available we will update this wikipage and wherever necessary
    
https://wiki.pumpingstationone.org/2019_Woodshop_Dust_Collection_Vote
 
https://wiki.pumpingstationone.org/2019_Woodshop_Dust_Collection_Vote
Line 8: Line 8:  
Soundproof Room for new system is almost completed. New unit should be purchased in early June. We are hoping for completion in July.  
 
Soundproof Room for new system is almost completed. New unit should be purchased in early June. We are hoping for completion in July.  
   −
New unit is is assembled and in place. We need to replace/reroute the ductwork and redo electrical for four major stationary tools (drum sander, planer,jointer and bandsaw)  
+
New unit is is assembled and in place. The team has  replaced/rerouted the ductwork and is in the process of redoing electrical for four major stationary tools (drum sander, planer,jointer and bandsaw) EcoGate automatic blast gates are installed. 
 
+
We are projecting December completion.  
Still projecting late October completion.  
      
—Gary  
 