Difference between revisions of "Electrical"

From Pumping Station One
Jump to navigation Jump to search
Line 178: Line 178:
 
! Breaker # !! Used !! What Is It
 
! Breaker # !! Used !! What Is It
 
|-
 
|-
| 8 || yes. works. || Back stairwell lights, catwalk lights, night light in the shop.
+
| 8 || in use || Back stairwell lights, catwalk lights, night light in the shop.
 
|-
 
|-
| 18 || yes. works. || Shop heating radiator fans and thermostats.
+
| 18 || in use || Shop heating radiator fans and thermostats.
 
|-
 
|-
| 20 || yes. works. || Outlet in closet
+
| 20 || in use || Outlet in closet
 
|-
 
|-
 
|}
 
|}

Revision as of 15:03, 10 January 2016

Power Panels

If you find out what a circuit breaker does, make sure it's numbered in the box and that information about what it powers ends up here. If possible, label the outlet box as well. What form this document takes remains to be seen; hopefully we will get a solid amount of information into it so further work on our electrical system won't totally be explorative.

First Floor

PP1-1

Back of the shop by the loading dock. Can't miss it.

Some sketchy shit in this one.

Single phase and 2 pole circuits wired to 3 phase breakers.

Several high amp 3 phase breakers that are unmapped.


Breaker # Used What Is It
8&10&12 unused 3 phase, 20 amp, 3 black. Wiring trough, boiler room. Dust collection circuit thru existing disconnect.
19&16&18 used 2-120v circuits on a 3 phase breaker. Blue wires. Boiler & zone pumps, this is bad and wrong.
22 unused this is a stray 208v single red wire on a 3 phase breaker that runs to wiring troughin the boiler room. Should be disconnected and abandoned.(used to be paired with wires pp1-2 # 35&37)

PP1-2

Back of the shop by the loading dock. Can't miss it.

Breaker # Used What Is It
6 Yes, works 20amp, 2 outlets hot metal side of furnace room, short drop near center of shop. Light in the boiler room.
8 Yes, works 20 amp, outlet at hot metal side of furnace room, possibly second outlet behind lockers.
7,9,11 yes. works. Power to chiller/heat pump on the roof for AC... and also the air handler under it inside. The
25 yes , works Lights at catwalk and kitchen, outlet at kitchen fridge.
26 yes, works Currently connected to the entire east wall. This includes dust collector and Clausing electronics. Please do not connect chop saw table to east wall while others are working.
35&37 used Compressor 40 amp 1 phase 240v thru a 35 amp disconnect in boiler room.

Small fuse box

Back of the shop, left of PP1-1, above the light switches.
Left fuse, exit signs.

PB1-1

An unremarkable box full of wires.

PB1-2

Power box connected to PP1-1 by conduit. Bridges the A/C heat pump/air handler circuit, among other things. The 3-phase for A/c heat pump and air handler is bridged such that the entire 3 phase comes from PP1-1 up to the roof via PB1-2, and a branch switched on the roof by relay comes back down in the same conduit that goes the the roof. This circuit is passed via conduit to the air handler, and switched manually on the bottom of the air handler.

PP1-3

Metal shop, by the lathes.

Breaker # Used What Is It
1, a&b yes, works 20 amp.
3, a&b ?
5&7, a&b yes, works 50 amp, 240v, cold metal.
5b & 7a yes works 20 amp 240v, dedicated Clausing lathe.

PP1-4

In the tool cage.

Breaker # Used What Is It
12 yes 20 amp, 120v, south wall of the shop.
14 yes 20 amp, 120v, south wall of the shop.
18&20 yes, works 50 amp, 240v, hot metal at welding area.
23 yes 20 amp 120v, south wall of the shop.
24&26 yes, works 15 amp, 240v, shopbot.
37 yes, works 20 amp, 120v, hot metal at welding area.

PP1-5

Cold Metal shop,

Breaker # Used What Is It
1 in use landlord circuit, don't touch
2 in use landlord circuit, don't touch
3 in use landlord circuit, don't touch
4 in use landlord circuit, don't touch
5 in use landlord circuit, don't touch
6 in use landlord circuit, don't touch
7 in use landlord circuit, don't touch
8 in use landlord circuit, don't touch
9
10
11
12
13
14
15
16 in use kitchen, above counter outlets.
17
18 in use 3 outlets, metal shop side of kitchen wall.
19
20

PP1-6

In the safe in the lounge. The top big breaker is the service disconnect for the whole box. This box covers everything in the lounge, the front entryway, and the upstairs bathroom.

Breaker # Used What Is It
1 yes. works. Lounge Everything. Upstairs bathroom for reasons unknown.

TODO: take down notes from tape in the box, mark them in table above

PP1-7

Blue fuse box in the furnace room. Powers just the air compressor.

Second Floor

PP2-1

In the AC/comms closet upstairs.

Breaker # Used What Is It
8 in use Back stairwell lights, catwalk lights, night light in the shop.
18 in use Shop heating radiator fans and thermostats.
20 in use Outlet in closet


PP2-2

On the catwalk.
This is a 3 phase panel,"High Leg Delta" configuration, http://en.wikipedia.org/wiki/High-leg_delta The center bus bar is 208v to neutral.

Breaker # Used What Is It
1 in use 20 amp,above kitchen ceiling, servers on catwalk
2 in use 20 amp, 2 lower outlets, in kitchen either side of door. Outlet at SEM location
3 Not used 208 volts to neutral, not recommended for use except in 3 phase circuit.
4 Not used 208 volts to neutral, not recommended for use except in 3 phase circuit.
5 in use split 20 amp breaker, 2 circuits a&b, Beer church.
6 in use paired with #8, 20 amp 240v, Oven, 8 gauge, 4 wires, capable of 50 amps
7 in use ?
8 in use paired with #6, 20 amp 240v, Oven, 8 gauge, 4 wires, capable of 50 amps
9 Not used 208 volts to neutral, not recommended for use except in 3 phase circuit.
10 Not used 208 volts to neutral, not recommended for use except in 3 phase circuit.
11 in use 20 amp, Laser
12 in use paired with # 14, 20 amp 240v, kitchen,above counter. For induction cook top
13
14 in use paired with # 12, 20 amp 240v, kitchen,above counter. For induction cook top
15
16 Not used 208 volts to neutral, not recommended for use except in 3 phase circuit.
17
18 in use 20 amp, Outlet at SEM location

Electrical Punch List

Desired Circuits

Hot Metals

Wood Shop

drops: http://www.mcmaster.com/#4804k12/=pmf353 ??

Other goodies

100 amp 5 wire 3 phase disconnect with lugs sufficient for #1 feeder cable. This could be located anywhere that is convenient.