This page is to support the space expansion and built-out. There's three purposes:

  • Serve as an central location for expansion plans
  • Allow interested parties to see what they can do to help.
  • Call out any needed donations (of materials or expertise).

If you would like to help maintain this, please log in using your PS1 login and password. Documentation on how to format things like headings, bullets, hyperlinks is (here in the MediaWiki manual).

Electrical

  • 2 electrical conduits lounge 2.0 need to be fastened to the wall with boxes and blank covers. This is Done
  • All electrical circuits need to be traced, all boxes should be labeled. Follow our current convention and you can record info here: Electrical
    This is done now

Security

  • We have two front doors and two back doors, and the loading dock. Our current security system is 4 channel. We need (5 to) 8 channels to cover all 5 locations. (Ryan Pierce sez)
  • Install security cameras above front and rear doors. Run wiring to furnace closet 2nd floor. Cameras and some wiring are said to exist.
  • Remove all other old (unused) cameras, they make some people grumpy.
    Two removed, one left in loading dock. Any others?

HVAC

  • Install ducting for Woodshop dust collection.
  • Install dust collector.
  • Install Hot Metals ventilation.
  • We need AC. Details to follow.

Construction

  • Walls are being torn down. We need to load the dumpster regularly so the debris is carted away. You can wheel the dumpster into the new space to do this. Dumpster is emptied Monday, Wednesday, Friday?
  • Make cool new radiator covers, lounge 2.0
  • This one's a little more involved. Replace glass in front windows lounge 2.0. This might evolve into new hardware and maybe even into making new sashes.

Painting

  • Clean up, patch and paint where wall was removed in lounge 2.0. Tony left paint, under electrical panel, new space. (Do we need drywall work?)

Misc

  • Install fire extinguishers and signs. They are said to exist. Upick locations, they can always be moved. I think some holders may need to be made or bought. Verify they are charged and tagged. This one applies to the entire space.