Changes

Jump to navigation Jump to search
96 bytes added ,  03:18, 2 April 2013
no edit summary
Line 20: Line 20:     
In the boiler room the two red pumps that force hot water for radiant heat in the front room and the shop area.  These pumps have three  ports for oil lubrication.  The two ports on either side of the pump get 3 drops of oil each, the covered port over the bearing needs one strong squirt.  This needs to be done annually.  This was last preformed 4/1/13.
 
In the boiler room the two red pumps that force hot water for radiant heat in the front room and the shop area.  These pumps have three  ports for oil lubrication.  The two ports on either side of the pump get 3 drops of oil each, the covered port over the bearing needs one strong squirt.  This needs to be done annually.  This was last preformed 4/1/13.
 +
 +
==== Filter ====
 +
 +
The furnace upstairs has a filter that will need to be changed every winter.
Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu