Difference between revisions of "Kitchen Buildout Costs Vote"

From Pumping Station One
Jump to navigation Jump to search
(Created page with 'This motion was proposed on April 16, 2013 ===Sponsor=== Eric Stein ===History=== April 16, 2013 - TBD, not yet proposed, being edited actively ===Language=== Pumping Station:…')
 
m (Robot: Cosmetic changes)
 
(9 intermediate revisions by 2 users not shown)
Line 1: Line 1:
This motion was proposed on April 16, 2013
+
This motion passed on April 23, 2013
  
===Sponsor===
+
=== Sponsor ===
 
Eric Stein
 
Eric Stein
  
===History===
+
=== History ===
April 16, 2013 - TBD, not yet proposed, being edited actively
+
April 16, 2013 - Proposed
  
===Language===
+
April 23, 2013 - Passed
Pumping Station: One will provide a budget of up to $970 to whomever purchases materials for and builds out a kitchen walls, ventilation, a water wall, and a new kitchen sink for Pumping Station: One where the kitchen equipment is currently located, also surrounding the beer brewing equipment.  This will not include electrical build out, which will be handled later once walls have been created to install electrical circuits in.
 
  
===Vote===
+
=== Language ===
Yea:  
+
Pumping Station: One will provide a budget of up to $970 to whomever purchases materials for and builds out kitchen walls for Pumping Station: One where the kitchen equipment is currently located, also enclosing the beer brewing equipment. This will not include electrical build out, which will be handled later once walls have been created to install electrical circuits in. The kitchen will be 13.5' x 32'.
Nay:
 
Present:  
 
  
[[Category: Votes]][[Category: 2013_Votes]]
+
=== Addendum ===
 +
 
 +
The plans are located at http://des.truct.org/forums/ps1_KITCHEN%202D.pdf - the eventual goal.
 +
 
 +
=== Vote ===
 +
Yea: 39
 +
Nay: 1
 +
Present: 2
 +
Total full members: 68. Quorum met. Motion passed.
 +
 
 +
[[Category:Votes]]
 +
[[Category:2013 Votes]]
 +
[[Category:Finance]]
 +
[[Category:Budget]]

Latest revision as of 00:13, 18 March 2014

This motion passed on April 23, 2013

Eric Stein

History

April 16, 2013 - Proposed

April 23, 2013 - Passed

Language

Pumping Station: One will provide a budget of up to $970 to whomever purchases materials for and builds out kitchen walls for Pumping Station: One where the kitchen equipment is currently located, also enclosing the beer brewing equipment. This will not include electrical build out, which will be handled later once walls have been created to install electrical circuits in. The kitchen will be 13.5' x 32'.

Addendum

The plans are located at http://des.truct.org/forums/ps1_KITCHEN%202D.pdf - the eventual goal.

Vote

Yea: 39 Nay: 1 Present: 2 Total full members: 68. Quorum met. Motion passed.