Difference between revisions of "Kitchen Buildout Costs Vote"

From Pumping Station One
Jump to navigation Jump to search
m (Robot: Cosmetic changes)
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
  This motion passed on April 23, 2013
+
This motion passed on April 23, 2013
  
===Sponsor===
+
=== Sponsor ===
 
Eric Stein
 
Eric Stein
  
===History===
+
=== History ===
 
April 16, 2013 - Proposed
 
April 16, 2013 - Proposed
  
 
April 23, 2013 - Passed
 
April 23, 2013 - Passed
  
===Language===
+
=== Language ===
Pumping Station: One will provide a budget of up to $970 to whomever purchases materials for and builds out kitchen walls for Pumping Station: One where the kitchen equipment is currently located, also enclosing the beer brewing equipment. This will not include electrical build out, which will be handled later once walls have been created to install electrical circuits in. The kitchen will be 13.5' x 32'.
+
Pumping Station: One will provide a budget of up to $970 to whomever purchases materials for and builds out kitchen walls for Pumping Station: One where the kitchen equipment is currently located, also enclosing the beer brewing equipment. This will not include electrical build out, which will be handled later once walls have been created to install electrical circuits in. The kitchen will be 13.5' x 32'.
  
===Addendum===
+
=== Addendum ===
  
 
The plans are located at http://des.truct.org/forums/ps1_KITCHEN%202D.pdf - the eventual goal.
 
The plans are located at http://des.truct.org/forums/ps1_KITCHEN%202D.pdf - the eventual goal.
  
===Vote===
+
=== Vote ===
 
Yea: 39
 
Yea: 39
 
Nay: 1
 
Nay: 1
Line 22: Line 22:
 
Total full members: 68. Quorum met. Motion passed.
 
Total full members: 68. Quorum met. Motion passed.
  
[[Category: Votes]][[Category: 2013_Votes]]
+
[[Category:Votes]]
 +
[[Category:2013 Votes]]
 +
[[Category:Finance]]
 +
[[Category:Budget]]

Latest revision as of 00:13, 18 March 2014

This motion passed on April 23, 2013

Eric Stein

History

April 16, 2013 - Proposed

April 23, 2013 - Passed

Language

Pumping Station: One will provide a budget of up to $970 to whomever purchases materials for and builds out kitchen walls for Pumping Station: One where the kitchen equipment is currently located, also enclosing the beer brewing equipment. This will not include electrical build out, which will be handled later once walls have been created to install electrical circuits in. The kitchen will be 13.5' x 32'.

Addendum

The plans are located at http://des.truct.org/forums/ps1_KITCHEN%202D.pdf - the eventual goal.

Vote

Yea: 39 Nay: 1 Present: 2 Total full members: 68. Quorum met. Motion passed.