Difference between revisions of "Kitchen Buildout Costs Vote"

From Pumping Station One
Jump to navigation Jump to search
Line 10: Line 10:
 
Pumping Station: One will provide a budget of up to $970 to whomever purchases materials for and builds out kitchen walls for Pumping Station: One where the kitchen equipment is currently located, also enclosing the beer brewing equipment.  This will not include electrical build out, which will be handled later once walls have been created to install electrical circuits in. The kitchen will be 13.5' x 32'.
 
Pumping Station: One will provide a budget of up to $970 to whomever purchases materials for and builds out kitchen walls for Pumping Station: One where the kitchen equipment is currently located, also enclosing the beer brewing equipment.  This will not include electrical build out, which will be handled later once walls have been created to install electrical circuits in. The kitchen will be 13.5' x 32'.
  
 +
===Addendum===
 +
 +
The plans for your edification are located at http://des.truct.org/forums/ps1_KITCHEN%202D.pdf - the eventual goal.
 
===Vote===
 
===Vote===
 
Yea:  
 
Yea:  

Revision as of 02:53, 17 April 2013

This motion was proposed on April 16, 2013

Eric Stein

History

April 16, 2013 - TBD, not yet proposed, being edited actively

Language

Pumping Station: One will provide a budget of up to $970 to whomever purchases materials for and builds out kitchen walls for Pumping Station: One where the kitchen equipment is currently located, also enclosing the beer brewing equipment. This will not include electrical build out, which will be handled later once walls have been created to install electrical circuits in. The kitchen will be 13.5' x 32'.

Addendum

The plans for your edification are located at http://des.truct.org/forums/ps1_KITCHEN%202D.pdf - the eventual goal.

Vote

Yea: Nay: Present: