Difference between revisions of "Meeting Notes 2009-04-14"
Jump to navigation
Jump to search
Knitmeapony (talk | contribs) |
m (Robot: Automated text replacement (-(\w+) MM-DD-YYYY=(\d{2})-(\d{2})-(\d{4}) +\1 YYYY-MM-DD=\4-\2-\3)) |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Meeting Notes | {{Meeting Notes | ||
− | | Previous MM-DD- | + | | Previous YYYY-MM-DD=2009-04-07 |
| Current YY-MM-DD=09-04-14 | | Current YY-MM-DD=09-04-14 | ||
− | | Next MM-DD- | + | | Next YYYY-MM-DD=2009-04-21 |
| YYYY=2009 | | YYYY=2009 | ||
}} | }} | ||
Line 31: | Line 31: | ||
* ''Add yourself if I missed you'' | * ''Add yourself if I missed you'' | ||
− | === Come to Order - 8:10=== | + | === Come to Order - 8:10 === |
* Current Membership update - Ishmael | * Current Membership update - Ishmael | ||
Line 46: | Line 46: | ||
** Buildout | ** Buildout | ||
*** The nuts and bolts infrastructure, not so much the aesthetic side. | *** The nuts and bolts infrastructure, not so much the aesthetic side. | ||
− | *** Sketchup, 3ds | + | *** Sketchup, 3ds & dxf posted on the mailing list. |
*** Drawn-out argument about roles of architects v. engineers. | *** Drawn-out argument about roles of architects v. engineers. | ||
Line 62: | Line 62: | ||
* Exit sign design competition | * Exit sign design competition | ||
− | ** 2 weeks to complete best idea to be voted on with random materials of Eric's choosing. | + | ** 2 weeks to complete best idea to be voted on with random materials of Eric's choosing. In this case an art deco exit sign. |
*** Team flaming cookoo clock has two weeks to complete a flaming cookoo clock. | *** Team flaming cookoo clock has two weeks to complete a flaming cookoo clock. | ||
Latest revision as of 20:23, 29 March 2014
Meeting Minutes | ||
---|---|---|
<< Meeting Notes 2009-04-07 | 2009 Meetings | Meeting Notes 2009-04-21 >> |
Attendance
- Eric M.
- Paul
- Sarah
- Jim
- Ishmael
- Josh
- Eli
- Eric H.
- Jeff
- John S.
- Jasna
- Dan DDB
- Dan K.
- Tim S.
- Teddie
- Nat
- Jordan
- Sacha
- Nicky
- Adam
- Tyler
- Add yourself if I missed you
Come to Order - 8:10
- Current Membership update - Ishmael
- 34 paying members (36 by next week)
- $2,770.20 on hand after security deposit is cashed
- Working on a budget for the space
- Set up funding goals
- Insurance
- Expecting to pay between 800 - 2,000/yr
- Would like to insure big ticket items (like laser cutter)
- Groups
- Buildout
- The nuts and bolts infrastructure, not so much the aesthetic side.
- Sketchup, 3ds & dxf posted on the mailing list.
- Drawn-out argument about roles of architects v. engineers.
- Buildout
- Safety Committee - Sacha
- No laser tattoos
- Training on heavy machinery & other safe practices
- http://wiki.nycresistor.com/images/6/66/Warninglabel.jpg
- Current progress posted on wiki.
- Safety Committee - Sacha
- Danger Committee - Nat
- A lot more members interested in danger than safety.
- Details to come
- Danger Committee - Nat
- Exit sign design competition
- 2 weeks to complete best idea to be voted on with random materials of Eric's choosing. In this case an art deco exit sign.
- Team flaming cookoo clock has two weeks to complete a flaming cookoo clock.
- 2 weeks to complete best idea to be voted on with random materials of Eric's choosing. In this case an art deco exit sign.
- Next weeks meeting at the space.
- Unless we have insurance in place, DO NOT bring anything that you don't plan on removing by the end of the meeting.
- For those that haven't visited yet, post on mailing list for keyholders to schedule between now and next Tues.
- Events
- Start a pool for the first time we get an unexpected visit by the polic/fire dept.
- Notacon
- Versionfest
- Chicago Nerd Social
- Geek Prom tentative June 7
- U of C scavenger hunt (May 7-10)
- Nicky & Paul on Graduate/Alumni team
- ACEN