Difference between revisions of "Meeting Notes 2012-08-14"

From Pumping Station One
Jump to navigation Jump to search
Line 6: Line 6:
 
}}
 
}}
  
Meeting Begin: XX:XX pm
+
Meeting Begin: 08:12 pm
  
 
=== Agenda ===
 
=== Agenda ===
Line 20: Line 20:
 
=== Minutes ===
 
=== Minutes ===
  
 +
* Tim Introduced the board
 +
* Tim had the new people introduce themselves
 +
* Tim doesn't have any buildout expenses to report as no-one has handed in any reciepts yet.
 +
* The SawStop table saw has come in and needs to be put together
 +
* We just paid our first electric bill and it was a little higher than expected.  Please don't leave lights or AC on.
 +
* There is a leak in the roof near the workshop AC.  Tim will speak with the landlord about it.
 +
* Tonight is 300 seconds of fame.
 +
* Wed. 7pm, Knit Lab with Shelly Lewis
 +
* Thurs. 7pm, Python Office Hours with Tim Saylor
 +
* We now need a new area host for graphic arts and textiles.  Nominate yourself if you are interested and feel you have skills in those areas.
 +
* There is now a giant chalk board up the side of the main stairs (thanks to Mallory) and there is a large mural in the back stairwell (thanks to Shellie)
 +
* New member Jeff has now brought in a large amount of new machine equipment
 +
* Power Wheels is going to the New York Maker Faire
 +
* TOOOL will be holding a "Locktoberfest" either the second or third Saturday of October involving beer, food, and lockpicking
 +
* Beer Church is going to start brewing at the space.
 +
* Anthony has researched building a small clean-room in the space for Open Science and is looking to plan the location for the walls.
  
Meeting End: XX:XX pm
+
 
 +
Meeting End: 08:45 pm

Revision as of 01:03, 17 August 2012


Meeting Minutes
<< [[Meeting Notes {{{Previous YYYY-MM-DD}}}]] 2012 Meetings [[Meeting Notes {{{Next YYYY-MM-DD}}}]] >>

Meeting Begin: 08:12 pm

Agenda

  • Magistratus Extraordinarious summary spend report?
  • Electricity is expensive (how expensive?) please remember to turn off lights & AC when not in use.
  • SawStop is here!


Announcements

Minutes

  • Tim Introduced the board
  • Tim had the new people introduce themselves
  • Tim doesn't have any buildout expenses to report as no-one has handed in any reciepts yet.
  • The SawStop table saw has come in and needs to be put together
  • We just paid our first electric bill and it was a little higher than expected. Please don't leave lights or AC on.
  • There is a leak in the roof near the workshop AC. Tim will speak with the landlord about it.
  • Tonight is 300 seconds of fame.
  • Wed. 7pm, Knit Lab with Shelly Lewis
  • Thurs. 7pm, Python Office Hours with Tim Saylor
  • We now need a new area host for graphic arts and textiles. Nominate yourself if you are interested and feel you have skills in those areas.
  • There is now a giant chalk board up the side of the main stairs (thanks to Mallory) and there is a large mural in the back stairwell (thanks to Shellie)
  • New member Jeff has now brought in a large amount of new machine equipment
  • Power Wheels is going to the New York Maker Faire
  • TOOOL will be holding a "Locktoberfest" either the second or third Saturday of October involving beer, food, and lockpicking
  • Beer Church is going to start brewing at the space.
  • Anthony has researched building a small clean-room in the space for Open Science and is looking to plan the location for the walls.


Meeting End: 08:45 pm