'' This page needs to be cleaned and updated ''
 +
 
Now that we've all but signed the new lease with Steve, we need to start planning the new workshop.
 
Now that we've all but signed the new lease with Steve, we need to start planning the new workshop.
  
==First things first==
+
== First things first ==
We need to start making BOMs (Bill of Materials). We can bring them to Home Depot for pricing. We also discussed getting in touch with Rubenstein for sponsorship or discounts. If we're going to do that someone needs to contact them ASAP so we don't end up waiting on them to get started.
+
We need to start making BOMs (Bill of Materials). We can bring them to Home Depot for pricing. We also discussed getting in touch with Rubenstein for sponsorship or discounts. If we're going to do that someone needs to contact them ASAP so we don't end up waiting on them to get started.
  
==Safety==
+
== Code Issues ==
  
*are there smoke detectors?
+
* Emergency Exit Signage (Sevin)
*fire extinguishers (at least 4)
+
* Emergency Lighting (Sevin)
**we should also get a compressed water extinguisher for putting out clothes
+
* Fire lane marking
*real first aid kit
+
** Hot Metals
**12 inch square acrylic mirrror next to it
+
** Cold Metals
*safety gear wall
+
** Electronics
**can we put it on the wall outside?
+
** Lounge
*If we keep the table saw, we need to see if Steve has the blade guard to put back on or we need to buy a new one.
+
** Arts and Crafts
*Emergency shower (rumoured to be in the works)
+
* Move inflamables cabinet away from cold metals fire lane and against a real wall  
 +
* Architects capacity drawings
 +
* Heat alarms
 +
** Kitchen
 +
** Boiler room
 +
** Next to inflamables cabinet
  
==Infrastructure==
+
== Safety ==
*better lighting
 
**get better bulbs and a new fixture
 
**under cabinet lighting
 
**emergency light
 
**Skylight?  [http://www.solatube.com solatubes are nifty]
 
*ventilation
 
**fumes for  welding, etc.
 
***requires ducting to be run through the wall to the main garage (''why?'')
 
***the ducting needs an axial fan (Patrick/Jordan may have one)
 
***a switch needs to turn on both the axial fan and the fan in the main garage
 
**dust collection from saws
 
*power
 
**we have 2 outlets with 220 V (in the middle of the shop, one on each side)
 
**things that need 220
 
***air compressor
 
***kiln
 
***end mill (that we're going to get, right?)
 
***lathe (also that we're going to get)
 
**are outlets on multiple circuits?
 
**extension cord reels hanging from ceilings (at least one for each workbench)
 
**Kill switches?
 
*workbenches
 
**finish work (smelly things, and general workspace)
 
**metalwork
 
**woodworking
 
*Tool Storage. There are three main types of tools that we have.  Each needs to be stored separately so that it's easy to find the right tool for the right job.
 
**Woodwork
 
**metalwork
 
**Mechanical
 
* slop sink
 
  
 +
* are there smoke detectors?
 +
* fire extinguishers (at least 4)
 +
** we should also get a compressed water extinguisher for putting out clothes
 +
* real first aid kit
 +
** Done - mounted by the door to the kitchen, along with a burn kit and bloodborne pathogen kit --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT)
 +
** 12 inch square acrylic mirrror next to it
 +
* safety gear wall
 +
** More or less in place as of this writing --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT)
 +
* Emergency shower (rumoured to be in the works)
 +
* Membership first aid courses
 +
* Outlet voltage signage
  
==Materials storage==
+
== Infrastructure ==
*could go above sump pumps (may need permission from Steve)
+
* better lighting
*do we want to provide a regular supply of ply wood and other materials, like Chez PS1 for wood?
+
** Shop lighting is much improved --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT)
**is anyone willing to take responsibility for keeping it stocked?
+
** under cabinet lighting
 +
** emergency light
 +
*** Sevin is currently working on a plan --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT)
 +
* ventilation
 +
** fumes for welding, etc.
 +
*** requires ducting to be run through the wall to the main garage (''why?'')
 +
*** the ducting needs an axial fan (Patrick/Jordan may have one)
 +
*** a switch needs to turn on both the axial fan and the fan in the main garage
 +
** dust collection from saws
 +
*** Dust collector is in place and being routed various places --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT)
 +
* power
 +
** we have 2 outlets with 220 V (in the middle of the shop, one on each side)
 +
** things that need 220
 +
*** air compressor
 +
*** kiln
 +
*** TIG (GTAW) Welder
 +
*** end mill (that we're going to get, right?)
 +
**** Bridgeport installed and powered --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT)
 +
*** lathe (also that we're going to get)
 +
**** clausing runs on 110v --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT)
 +
** are outlets on multiple circuits?
 +
** extension cord reels hanging from ceilings (at least one for each workbench)
 +
** Kill switches?
 +
* workbenches
 +
** finish work (smelly things, and general workspace)
 +
** metalwork
 +
** woodworking
 +
* Tool Storage. There are three main types of tools that we have. Each needs to be stored separately so that it's easy to find the right tool for the right job.
 +
** Woodwork
 +
** metalwork
 +
** Mechanical
 +
* slop sink
  
===Types===
+
== Materials storage ==
**wood stock
+
* could go above sump pumps (may need permission from Steve)
**wood scrap (a limited space!)
+
* do we want to provide a regular supply of ply wood and other materials, like Chez PS1 for wood?
**metal stock
+
** is anyone willing to take responsibility for keeping it stocked?
**metal scrap
 
  
==Tools, etc==
+
== Tools, etc ==
*pegboard
+
* pegboard
*do we mount it on the walls or on the moveable tables?
+
* do we mount it on the walls or on the moveable tables?
*cleaning rack (by the entrance)
+
* cleaning rack (by the entrance)
*a sliding door would be cool (''door for what?'')
+
* a sliding door would be cool for the kitchen
**cut a regular sized door into it (with a window)
+
** cut a regular sized door into it (with a window)
*install a doorbell buzzer
+
* install a doorbell buzzer
*Dan may be able to get us a mill and a lathe
+
* Dan may be able to get us a mill and a lathe
**do we have the room for them?
+
** do we have the room for them?
*finish workbenches should have MDF tops with a clear (or opaque) coating to protect from spills
+
* finish workbenches should have MDF tops with a clear (or opaque) coating to protect from spills
*woodworking benches should be bare, but a coating is not the worst thing in the world
+
* woodworking benches should be bare, but a coating is not the worst thing in the world
**must have bench vice [http://www.google.com/products/catalog?q=woodworking+vice&hl=en&safe=off&cid=15677320443925386687&os=sellers# example for $50]
+
** must have bench vice [http://www.google.com/products/catalog?q=woodworking+vice&hl=en&safe=off&cid=15677320443925386687&os=sellers# example for $50]
**Should have holes for bench dogs or holdfasts.
+
** Should have holes for bench dogs or holdfasts.
*metalworking benches should have metal or pressboard. Pressboard cuts down on noise.
+
* metalworking benches should have metal or pressboard. Pressboard cuts down on noise.
**must have a metalworking bench vice (like the big red one we already have.)
+
** must have a metalworking bench vice (like the big red one we already have.)  
**should be on pedal lock casters, not butterfly; solid polyurethane; rated for at least 200 lbs
+
** should be on pedal lock casters, not butterfly; solid polyurethane; rated for at least 200 lbs
*shallow open shelves for hardware
+
* shallow open shelves for hardware
*welding curtain
+
* welding curtain
*back wall should be painted flat black to cut down UV reflection
+
* back wall should be painted flat black to cut down UV reflection
*sheet metal shielding should go around the dry wall near the hot area
+
* sheet metal shielding should go around the dry wall near the hot area
*Tool locations should be included in layout.
+
* Tool locations should be included in layout.
**All tools should have at least 2 ft clearance on 3 sides.
+
** All tools should have at least 2 ft clearance on 3 sides.
**All decent tablesaws are big, and require at least enough space to cut a 4x8 sheet.
+
** All decent tablesaws are big, and require at least enough space to cut a 4x8 sheet.
**shopsmith needs access from 4 sides, but is movable, and may not require permanenly allocated space.
+
** shopsmith needs access from 4 sides, but is movable, and may not require permanenly allocated space.
**radial arm saw or chop saw needs 4-6ft on either side for stock overhang.
+
** radial arm saw or chop saw needs 4-6ft on either side for stock overhang.

Latest revision as of 20:54, 30 September 2014

This page needs to be cleaned and updated

Now that we've all but signed the new lease with Steve, we need to start planning the new workshop.

First things first

We need to start making BOMs (Bill of Materials). We can bring them to Home Depot for pricing. We also discussed getting in touch with Rubenstein for sponsorship or discounts. If we're going to do that someone needs to contact them ASAP so we don't end up waiting on them to get started.

Code Issues

  • Emergency Exit Signage (Sevin)
  • Emergency Lighting (Sevin)
  • Fire lane marking
    • Hot Metals
    • Cold Metals
    • Electronics
    • Lounge
    • Arts and Crafts
  • Move inflamables cabinet away from cold metals fire lane and against a real wall
  • Architects capacity drawings
  • Heat alarms
    • Kitchen
    • Boiler room
    • Next to inflamables cabinet

Safety

  • are there smoke detectors?
  • fire extinguishers (at least 4)
    • we should also get a compressed water extinguisher for putting out clothes
  • real first aid kit
    • Done - mounted by the door to the kitchen, along with a burn kit and bloodborne pathogen kit --Dbever (talk) 15:34, 30 September 2014 (CDT)
    • 12 inch square acrylic mirrror next to it
  • safety gear wall
    • More or less in place as of this writing --Dbever (talk) 15:34, 30 September 2014 (CDT)
  • Emergency shower (rumoured to be in the works)
  • Membership first aid courses
  • Outlet voltage signage

Infrastructure

  • better lighting
    • Shop lighting is much improved --Dbever (talk) 15:34, 30 September 2014 (CDT)
    • under cabinet lighting
    • emergency light
      • Sevin is currently working on a plan --Dbever (talk) 15:34, 30 September 2014 (CDT)
  • ventilation
    • fumes for welding, etc.
      • requires ducting to be run through the wall to the main garage (why?)
      • the ducting needs an axial fan (Patrick/Jordan may have one)
      • a switch needs to turn on both the axial fan and the fan in the main garage
    • dust collection from saws
      • Dust collector is in place and being routed various places --Dbever (talk) 15:34, 30 September 2014 (CDT)
  • power
    • we have 2 outlets with 220 V (in the middle of the shop, one on each side)
    • things that need 220
      • air compressor
      • kiln
      • TIG (GTAW) Welder
      • end mill (that we're going to get, right?)
        • Bridgeport installed and powered --Dbever (talk) 15:34, 30 September 2014 (CDT)
      • lathe (also that we're going to get)
        • clausing runs on 110v --Dbever (talk) 15:34, 30 September 2014 (CDT)
    • are outlets on multiple circuits?
    • extension cord reels hanging from ceilings (at least one for each workbench)
    • Kill switches?
  • workbenches
    • finish work (smelly things, and general workspace)
    • metalwork
    • woodworking
  • Tool Storage. There are three main types of tools that we have. Each needs to be stored separately so that it's easy to find the right tool for the right job.
    • Woodwork
    • metalwork
    • Mechanical
  • slop sink

Materials storage

  • could go above sump pumps (may need permission from Steve)
  • do we want to provide a regular supply of ply wood and other materials, like Chez PS1 for wood?
    • is anyone willing to take responsibility for keeping it stocked?

Tools, etc

  • pegboard
  • do we mount it on the walls or on the moveable tables?
  • cleaning rack (by the entrance)
  • a sliding door would be cool for the kitchen
    • cut a regular sized door into it (with a window)
  • install a doorbell buzzer
  • Dan may be able to get us a mill and a lathe
    • do we have the room for them?
  • finish workbenches should have MDF tops with a clear (or opaque) coating to protect from spills
  • woodworking benches should be bare, but a coating is not the worst thing in the world
    • must have bench vice example for $50
    • Should have holes for bench dogs or holdfasts.
  • metalworking benches should have metal or pressboard. Pressboard cuts down on noise.
    • must have a metalworking bench vice (like the big red one we already have.)
    • should be on pedal lock casters, not butterfly; solid polyurethane; rated for at least 200 lbs
  • shallow open shelves for hardware
  • welding curtain
  • back wall should be painted flat black to cut down UV reflection
  • sheet metal shielding should go around the dry wall near the hot area
  • Tool locations should be included in layout.
    • All tools should have at least 2 ft clearance on 3 sides.
    • All decent tablesaws are big, and require at least enough space to cut a 4x8 sheet.
    • shopsmith needs access from 4 sides, but is movable, and may not require permanenly allocated space.
    • radial arm saw or chop saw needs 4-6ft on either side for stock overhang.