Difference between revisions of "Shopbot PRS CNC router"

From Pumping Station One
Jump to navigation Jump to search
m (Robot: Cosmetic changes)
Line 24: Line 24:
  
 
* Safety
 
* Safety
**Safety Glasses
+
** Safety Glasses
**Hearing Protection
+
** Hearing Protection
  
 
* What can go wrong (and what to do)
 
* What can go wrong (and what to do)
Line 31: Line 31:
 
* Daily Maintenance
 
* Daily Maintenance
 
** Spindle bearing warm up.
 
** Spindle bearing warm up.
*** The "C5" warm up routine should be run on the first job of the day. It runs the spindle at 3 speeds for 3 minutes each to warm up the bearings. (When it doubt, warm it up)
+
*** The "C5" warm up routine should be run on the first job of the day. It runs the spindle at 3 speeds for 3 minutes each to warm up the bearings. (When it doubt, warm it up)
  
 
* Extended Maintenance
 
* Extended Maintenance
Line 38: Line 38:
  
 
* Machine Control
 
* Machine Control
**Turn on sequence
+
** Turn on sequence
***Log into computer
+
*** Log into computer
***Turn on Shopbot big red and yellow twist switch
+
*** Turn on Shopbot big red and yellow twist switch
***Insert Key and turn to "engaged" position.
+
*** Insert Key and turn to "engaged" position.
***The VDF should light up, the spindle fan should be on.
+
*** The VDF should light up, the spindle fan should be on.
***Start "Shopbot 3" program.
+
*** Start "Shopbot 3" program.
**Jogging
+
** Jogging
***Keypad
+
*** Keypad
***Arrow Keys + Page Up, Page Down(ctrl for fast jog)
+
*** Arrow Keys + Page Up, Page Down(ctrl for fast jog)
  
 
   
 
   
Line 66: Line 66:
 
* How to leave the machine (be excellent)
 
* How to leave the machine (be excellent)
 
** Machine
 
** Machine
***Turn off both switches
+
*** Turn off both switches
***Remove Key
+
*** Remove Key
***Remove bit and collet.
+
*** Remove bit and collet.
***Place both collet wrenches on top of electronics box
+
*** Place both collet wrenches on top of electronics box
***Remove all clamps
+
*** Remove all clamps
***Smooth out wasteboard if you puckered it at all.
+
*** Smooth out wasteboard if you puckered it at all.
 
   
 
   
 
** Post a picture please :-)
 
** Post a picture please :-)

Revision as of 23:01, 15 June 2014


Shopbot PRS CNC router
File:No
Owner/Loaner PS:One
Serial Number TBD.
Make/Model Shopbot PRS
Arrival Date 2014
Usability Not Yet
Contact Elizabeth, Bart
Where TBD
Authorization Needed yes
Hackable no
Estimated Value $16000
Host Area {{{hostarea}}}


Shopbot PRS CNC router Area: {{{hostarea}}} https://wiki.pumpingstationone.org/wiki/Shopbot_PRS_CNC_router



Documentation

File:Shopbotassembly.pdf

Certification Checklist

This is here as a checklist for proctors to follow when certifying people. It can also help remind you of things after you are certified. Just reading this does not certify you.

  • How to get certified
  • Safety
    • Safety Glasses
    • Hearing Protection
  • What can go wrong (and what to do)
  • Daily Maintenance
    • Spindle bearing warm up.
      • The "C5" warm up routine should be run on the first job of the day. It runs the spindle at 3 speeds for 3 minutes each to warm up the bearings. (When it doubt, warm it up)
  • Extended Maintenance
    • Grease the racks
    • Use Grease type: TBD
  • Machine Control
    • Turn on sequence
      • Log into computer
      • Turn on Shopbot big red and yellow twist switch
      • Insert Key and turn to "engaged" position.
      • The VDF should light up, the spindle fan should be on.
      • Start "Shopbot 3" program.
    • Jogging
      • Keypad
      • Arrow Keys + Page Up, Page Down(ctrl for fast jog)


  • CAM Software
  • Running your Job
  • Waste Board and clamping
  • Collets, Bits, Feeds and Speeds
    • Collets
      • We currently have collets for 1/2, 1/4, 3/16 and 1/8" shank bits.
      • Try to keep them clean and store them away from dust between uses. Dust between the gaps will produce runout.
  • ShopBot should not be used for...
    • Metals other than aluminum
    • Ripping lumber
  • How to leave the machine (be excellent)
    • Machine
      • Turn off both switches
      • Remove Key
      • Remove bit and collet.
      • Place both collet wrenches on top of electronics box
      • Remove all clamps
      • Smooth out wasteboard if you puckered it at all.
    • Post a picture please :-)

Authorized Users

Qualified Member Trained By
Elizabeth Koprucki Danger Committee
Bart Dring Danger Committee
Ryan Pierce Danger Committee
Nathan Ellis Danger Committee