Difference between revisions of "Space Plan Vote"

From Pumping Station One
Jump to navigation Jump to search
Line 11: Line 11:
 
** Abstain:   
 
** Abstain:   
 
** Discarded due to invalid proxy format:   
 
** Discarded due to invalid proxy format:   
** Result: Vote passes
+
** Result:
  
 
== Background ==
 
== Background ==

Revision as of 17:53, 10 April 2016

Sponsors

Dean Anderson

History

  • Mailing List Announcement:
  • Officially Proposed:
  • Voted on:
    • Quorum:
    • Yes:
    • No:
    • Abstain:
    • Discarded due to invalid proxy format:
    • Result:

Background

The space planning committee has created 3 proposals for how the building will be used after we expand. put link to plans here. This vote will determine which of the 3 plans is preferred by the membership.

The 3 plans share these characteristics: Electronics - no change Graphics Arts and Textiles - expands to fill its current room Clean CNC (laser cutters & 3D printers) - move to what is currently the lounge The room to the right of our entryway (looking from Elston) becomes a lounge/small meeting room. Existing partitions will be removed. No changes to our current space that require a building permit.

Plan notes

Plan 1: Woodworking and dusty CNC tools move to new space. Dust and noise are isolated from other areas with a wall. Close proximity to the loading dock allows for easy delivery of sheet goods and lumber. Hot metals moves to the front of the new space where through-the-roof ventilation is best. Cold metals and jewelry expand into the current woodshop.

Plan 2: Hot metals moves to the back of the new space. Opening the two big doors will give hot metals good ventilation. There is a smaller, but adequate, vent through the roof for welding and forge ventilation. Woodworking moves to the front of the new space. Dust and noise are isolated from other areas with a wall. Materials can be delivered through the front door on the Elston side of the new space. Cold metals and jewelry expand into the current woodshop.

Plan 3: Woodworking expands into the cold metals area. Cold and hot metals moves to the new side. This plan minimizes disruption of the woodshop and rework of the woodworking dust collection system, but the doesn't contain the dust. The kitchen, catwalk storage will still be dusty.


Voting -

Full members will determine the preferred space plan using instant-runoff voting. https://en.wikipedia.org/wiki/Instant-runoff_voting Voters will rank order the 4 options (3 plans plus 'none of the above'). Votes will be tallied using the method described in the above link.

Language

Vote

  • Quorum:
  • Yay:
  • Nay:
  • Abstain:
  • Round 1: plan 1 x, plan 2 x, plan 3 x, NOTA x
  • Round 2: plan 1 x, plan 2 x, plan 3 x, NOTA x