Space Plan Vote
Sponsors
History
- Mailing List Announcement:
- Officially Proposed:
- Voted on:
- Quorum:
- Yes:
- No:
- Abstain:
- Discarded due to invalid proxy format:
- Result: Vote passes
Background
The 3 plans share these characteristics: Electronics - no change Graphics Arts and Textiles - expands to fill its current room Clean CNC (laser cutters & 3D printers) - move to what is currently the lounge The room to the right of our entryway (looking from Elston) becomes a lounge/small meeting room. Existing partitions will be removed. No changes to our current space that require a building permit.
Plan 1:
Plan 2:
Plan 3:
Voting -
Full members will determine the preferred space plan using instant-runoff voting. https://en.wikipedia.org/wiki/Instant-runoff_voting Voters will rank order the 4 options (3 plans plus 'none of the above'). Votes will be tallied using the method described in the above link.
Language
Vote
- Quorum:
- Yay:
- Nay:
- Abstain:
- Round 1: plan 1 x, plan 2 x, plan 3 x, NOTA x
- Round 2: plan 1 x, plan 2 x, plan 3 x, NOTA x