Difference between revisions of "Ventilation for Hot Metals Area Vote"

From Pumping Station One
Jump to navigation Jump to search
m (Robot: Cosmetic changes)
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
===Sponsor===
+
=== Sponsor ===
 
Adrianna McKinley
 
Adrianna McKinley
  
===History===
+
=== History ===
 
* September 19th, 2013 - Introduced
 
* September 19th, 2013 - Introduced
 
* September 24th, 2013 - Proposed Vote date, missed due to failure to wiki
 
* September 24th, 2013 - Proposed Vote date, missed due to failure to wiki
* October 1st, 2013 - Vote date
+
* October 1st, 2013 - Vote passed, 27 yes, 1 no
  
===Language===
+
=== Language ===
  
I would like to propose a vote to install ventilation in the back of the warehouse (by the HVAC room) to the left of the fire lane (as you look to the back door) where the Hot Metals Area will reside. Please See the attached SUPER ACCURATE* drawing for clarification on location.
+
I would like to propose a vote to install ventilation in the back of the warehouse (by the HVAC room) to the left of the fire lane (as you look to the back door) where the Hot Metals Area will reside. Please See the attached SUPER ACCURATE* drawing for clarification on location.
  
 
I have an estimate (also attached) for $560 for the roof work required to set up the ventilation. And Michael Skilton has most of the other parts to the system.
 
I have an estimate (also attached) for $560 for the roof work required to set up the ventilation. And Michael Skilton has most of the other parts to the system.
Line 19: Line 19:
  
  
*Not in any way to scale or even relatively accurate. But you get the idea.
+
* Not in any way to scale or even relatively accurate. But you get the idea.
  
 
==== Attachments ====
 
==== Attachments ====
Line 26: Line 26:
 
[[File:Super Accurate Blueprints.jpg]]
 
[[File:Super Accurate Blueprints.jpg]]
  
===Vote===
+
=== Vote ===
  
 
Quorum:  
 
Quorum:  
 
Yea:  
 
Yea:  
 
Nay:  
 
Nay:  
Present:  
+
Present:
  
[[Category: Votes]][[Category: 2013_Votes]]
+
[[Category:Votes]]
 +
[[Category:2013 Votes]]

Latest revision as of 00:31, 18 March 2014

Adrianna McKinley

History

  • September 19th, 2013 - Introduced
  • September 24th, 2013 - Proposed Vote date, missed due to failure to wiki
  • October 1st, 2013 - Vote passed, 27 yes, 1 no

Language

I would like to propose a vote to install ventilation in the back of the warehouse (by the HVAC room) to the left of the fire lane (as you look to the back door) where the Hot Metals Area will reside. Please See the attached SUPER ACCURATE* drawing for clarification on location.

I have an estimate (also attached) for $560 for the roof work required to set up the ventilation. And Michael Skilton has most of the other parts to the system.


VOTE: Approve funds up to $700 to install ventilation system for Hot Metals Area.

Vote Date: Tuesday, September 24th 2013 (unless I'm proposing this too late - I'm not sure :-/ )


  • Not in any way to scale or even relatively accurate. But you get the idea.

Attachments

Ventilation Quote.jpg Super Accurate Blueprints.jpg

Vote

Quorum: Yea: Nay: Present: