Ventilation for Hot Metals Area Vote

From Pumping Station One
Revision as of 17:56, 30 September 2013 by Toba (talk | contribs) (→‎Attachments)

Adrianna McKinley

History

September 19th, 2013 - Introduced September 24th, 2013 - Proposed Vote date, missed due to failure to wiki October 1st, 2013 - Vote date

Language

I would like to propose a vote to install ventilation in the back of the warehouse (by the HVAC room) to the left of the fire lane (as you look to the back door) where the Hot Metals Area will reside. Please See the attached SUPER ACCURATE* drawing for clarification on location.

I have an estimate (also attached) for $560 for the roof work required to set up the ventilation. And Michael Skilton has most of the other parts to the system.


VOTE: Approve funds up to $700 to install ventilation system for Hot Metals Area.

Vote Date: Tuesday, September 24th 2013 (unless I'm proposing this too late - I'm not sure :-/ )


  • Not in any way to scale or even relatively accurate. But you get the idea.

Attachments

   

Vote

Quorum: Yea: Nay: Present: