Background

We are preparing a new vote for the kitchen area renovation and we need to decide what territory the future renovated kitchen will occupy. Plans are provided showing the two different floor layouts that may occur should we pass a kitchen renovation vote. This vote is to decide if we should pursue a new plan A over the old plan B when we set up the vote. This is not a vote to renovate the kitchen yet but it is a vote to determine what territory the kitchen will occupy.

The main purpose of this vote is to reinstate the kitchen renovation budget that expired while taking advantage of space that became available during the space expansion. One space issue that has become evident is the disconnect between the kitchen and the lounge.

Do you want the official Kitchen Area to shift over to occupy what was once slotted to be the small metals area, is now officially general area space, and is now being occupied by cold metals?

Kitchen-plan-A-2017.jpg

Kitchen-plan-B-2017.jpg

Two-plans-overlapped.jpg

Benefits of Plan A over Plan B

  • More convenient access from kitchen area to all other departments.
  • Ability to host more people in the lounge for events if the food is fully accessible in the kitchen.
  • Beer church and all of it’s equipment can remain where it is currently stationed.
  • The linens and dishes cabinet will be located more conveniently by the sink.
  • Noise buffering between the lounge and general shop area.
  • General area in the shop becomes contiguous.

Complications

An extra wall and doorway (1.5 doorway like those leading out of the foyer) will have to be installed. The view from one end of the building to the other will change. Cold metals will have to shift equipment (for which there is support in the cold metals area).

Beer Church

The long-standing beer church has housed all of it's equipment and fermentation chamber in the kitchen area. The kitchen area no longer has a desire to host beer church within its confines and would like to transfer it to the General area. At some point during the expansion some part of Beer church was partially displaced to the dock area which has been determined to be an unsuitable location. All of beer church will be housed in a specific location withing the General area depending on which plan is chosen. In plan A beer church will be consolidated to the fermentation chamber's current wall with a total depth of 3 ft from the wall from the kitchen doorway to the north wall. In plan B beer church will move on the short outside wall of the kitchen from the outside corner of the kitchen to the outside of the kitchen pass-through ust out

Budgeting

As the membership grows, so does the need for storage, improved hygienic conditions and further dining accommodations in the kitchen. Our goal is to bring the current kitchen inline with a commercial kitchen, providing a space for safe food preparation.

The following will be included in this vote:

  • Donated Commercial Range - Free
  • Range vent hood ~ $1500.00
  • Range and vent hood installation cost ~ $3000
  • Install a 10" ventilation duct for the commercial range in the kitchen ~$300.00 COMPLETED
  • Cubby/Electrical Build-out ~$100.00 - A cubby hole extending into the general area needs to be built to make room for the commercial range.
  • Cabinetry and wall re-framing/re-enforcing ~$1500.00 - Depending The kitchen will be expanding with the relocation of beer church. Upper and lower cabinets will be installed in this new dining area.
  • Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor with epoxy paint.
  • Additional Equipment ~$600.00 - Pantry/dry food storage, stainless steel island cart w/casters, stainless steel table/s.

Optional Renovation Enhancements

Should the budget allow due to savings from the purchase of discounted and/or donated materials, the below shall be included in this vote.

  • Sanitary, heat resistant dining table and chairs/stools
  • Backsplash tiles
  • Stainless Steel corner tables
  • Hanging racks
  • Sanitary garbage disposal
  • Metal rack
  Sub total:  $3700
  -plus 20% contingency funds         
  Total:  $4440.00


Language

We authorize the board to shift the kitchen area so that it connects directly to the lounge in accordance to the submitted plan A. We authorize the board to spend up to $4200.00 for equipment, materials, and supplies to renovate the kitchen. The budgeted funds are valid for 6 months after the passing of this vote.