Difference between revisions of "Vote to Renovate the Kitchen"
Jump to navigation
Jump to search
Line 16: | Line 16: | ||
<ol> | <ol> | ||
− | <li>Donated Commercial | + | <li>Donated Commercial Range - Free, will install in-house.</li> |
− | * Commercial | + | * Commercial Range Vent Hood $1500.00 - New Commercial Range Hood |
− | * Install a 10" ventilation duct for the commercial | + | Used may be missing insert - Shelly and Gerald located a residential stove vent hood in great condition at Evanston Rebuilders Warehouse. It is being held without deposit for up to two weeks. If funding for deposit, and/or purchase does not become available in time, another vote may need to be drafted for up to the retail cost of a new commercial range vent hood. |
− | * Cubby/Electrical Build-out $100.00 - A cubby hole extending into the general area needs to be built to make room for the commercial | + | * Install a 10" ventilation duct for the commercial range in the kitchen - $300.00. |
+ | * Cubby/Electrical Build-out $100.00 - A cubby hole extending into the general area needs to be built to make room for the commercial range. | ||
<li>Cabinetry and wall re-framing/re-enforcing $1000.00- The kitchen will be expanding with the relocation of beer church. Upper and lower cabinets will be installed in this new dining area.</li> | <li>Cabinetry and wall re-framing/re-enforcing $1000.00- The kitchen will be expanding with the relocation of beer church. Upper and lower cabinets will be installed in this new dining area.</li> | ||
<li>Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor.</li> | <li>Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor.</li> | ||
Line 40: | Line 41: | ||
</ol> | </ol> | ||
− | Sub total: $ | + | Sub total: $3500 |
plus 20% contingency funds | plus 20% contingency funds | ||
− | Total $ | + | Total $4200.00 |
== Language == | == Language == | ||
− | We authorize the board to spend up to $ | + | We authorize the board to spend up to $4200.00 for equipment, materials and supplies to renovate the kitchen. |
The funding for this vote will expire 6 months from the date of approval. | The funding for this vote will expire 6 months from the date of approval. |
Revision as of 02:49, 7 October 2016
Sponsors
- Gerald Gayares
- Adriana Garcia
History
- Mailing List Announcement: 10/01/16
- Officially Proposed: 10/04/16
- To be Voted on:
Background
As the membership grows, so does the need for storage, improved hygienic conditions and further dining accommodations in the kitchen. Our goal is to bring the current kitchen inline with a commercial kitchen, providing a space for safe food preparation.
The following will be included in this vote:
- Donated Commercial Range - Free, will install in-house.
- Commercial Range Vent Hood $1500.00 - New Commercial Range Hood
- Install a 10" ventilation duct for the commercial range in the kitchen - $300.00.
- Cubby/Electrical Build-out $100.00 - A cubby hole extending into the general area needs to be built to make room for the commercial range.
- Cabinetry and wall re-framing/re-enforcing $1000.00- The kitchen will be expanding with the relocation of beer church. Upper and lower cabinets will be installed in this new dining area.
- Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor.
- Equipment $600.00 - Pantry/dry food storage, stainless steel island cart w/casters, stainless steel table/s.
- Optional Renovation Enhancements - Should the budget allow due to savings from the purchase of discounted and/or donated materials, the below shall be included in this vote.
- Sanitary, heat resistant dining table and chairs/stools
- Backsplash tiles
- Stainless Steel corner tables
- Hanging racks
- Sanitary garbage disposal
- Metal rack
Sub total: $3500
plus 20% contingency funds
Total $4200.00
Language
We authorize the board to spend up to $4200.00 for equipment, materials and supplies to renovate the kitchen.
The funding for this vote will expire 6 months from the date of approval.