Difference between revisions of "Vote to improve hot metals air quality"

From Pumping Station One
Jump to navigation Jump to search
(Created page with "== Sponsors == * Tom Judge == History == * Mailing List Announcement: 4/25/2017 * Officially Proposed: TBD * To be Voted on: TBD == Background == With the increased size,...")
 
Line 19: Line 19:
 
* 2 Ceiling mounted general air filtration systems
 
* 2 Ceiling mounted general air filtration systems
 
** Jet AFS-1000B
 
** Jet AFS-1000B
* 1 Metal dust collector for attaching to the grinders
+
* Metal dust collector for attaching to the grinders
 
** Jet JDC-501
 
** Jet JDC-501
 
* Extending the wall between hot metals and the wood shop to the ceiling
 
* Extending the wall between hot metals and the wood shop to the ceiling
 
* Installing a door or curtain between hot metals and the wood shop
 
* Installing a door or curtain between hot metals and the wood shop
 +
* Installing a make up air vent
  
 
== Language ==
 
== Language ==
  
Authorise the BoD to spend up to $12,000 on improving the air quality in hot metals.
+
Authorise the BoD to spend up to $15,000 on improving the air quality in hot metals.
  
 
This authorisation shall expire at midnight on December 31, 2017.
 
This authorisation shall expire at midnight on December 31, 2017.

Revision as of 15:18, 25 April 2017

Sponsors

  • Tom Judge

History

  • Mailing List Announcement: 4/25/2017
  • Officially Proposed: TBD
  • To be Voted on: TBD

Background

With the increased size, equipment, and usage hot metals can be a very unpleasant are to work in when its busy. This vote is to provide the following:

  • 2 Point of generation welding fume extraction arms
    • Lincoln LFA 4.1 13ft arms with wall mounts
    • 1700 CFM 2HP blower
    • Ducting and other accessories
  • 2 Ceiling mounted general air filtration systems
    • Jet AFS-1000B
  • Metal dust collector for attaching to the grinders
    • Jet JDC-501
  • Extending the wall between hot metals and the wood shop to the ceiling
  • Installing a door or curtain between hot metals and the wood shop
  • Installing a make up air vent

Language

Authorise the BoD to spend up to $15,000 on improving the air quality in hot metals.

This authorisation shall expire at midnight on December 31, 2017.


Receipts