Difference between revisions of "Vote to improve hot metals air quality"
Jump to navigation
Jump to search
Amishhammer (talk | contribs) (Created page with "== Sponsors == * Tom Judge == History == * Mailing List Announcement: 4/25/2017 * Officially Proposed: TBD * To be Voted on: TBD == Background == With the increased size,...") |
Amishhammer (talk | contribs) |
||
Line 19: | Line 19: | ||
* 2 Ceiling mounted general air filtration systems | * 2 Ceiling mounted general air filtration systems | ||
** Jet AFS-1000B | ** Jet AFS-1000B | ||
− | * | + | * Metal dust collector for attaching to the grinders |
** Jet JDC-501 | ** Jet JDC-501 | ||
* Extending the wall between hot metals and the wood shop to the ceiling | * Extending the wall between hot metals and the wood shop to the ceiling | ||
* Installing a door or curtain between hot metals and the wood shop | * Installing a door or curtain between hot metals and the wood shop | ||
+ | * Installing a make up air vent | ||
== Language == | == Language == | ||
− | Authorise the BoD to spend up to $ | + | Authorise the BoD to spend up to $15,000 on improving the air quality in hot metals. |
This authorisation shall expire at midnight on December 31, 2017. | This authorisation shall expire at midnight on December 31, 2017. |
Revision as of 15:18, 25 April 2017
Sponsors
- Tom Judge
History
- Mailing List Announcement: 4/25/2017
- Officially Proposed: TBD
- To be Voted on: TBD
Background
With the increased size, equipment, and usage hot metals can be a very unpleasant are to work in when its busy. This vote is to provide the following:
- 2 Point of generation welding fume extraction arms
- Lincoln LFA 4.1 13ft arms with wall mounts
- 1700 CFM 2HP blower
- Ducting and other accessories
- 2 Ceiling mounted general air filtration systems
- Jet AFS-1000B
- Metal dust collector for attaching to the grinders
- Jet JDC-501
- Extending the wall between hot metals and the wood shop to the ceiling
- Installing a door or curtain between hot metals and the wood shop
- Installing a make up air vent
Language
Authorise the BoD to spend up to $15,000 on improving the air quality in hot metals.
This authorisation shall expire at midnight on December 31, 2017.