| == Electrical == | | == Electrical == |
− | * 2 electrical conduits lounge 2.0 need to be fastened to the wall with boxes and blank covers. | + | * <strike>2 electrical conduits lounge 2.0 need to be fastened to the wall with boxes and blank covers.</strike> ''This is Done'' |
− | * All electrical circuits need to be traced, all boxes should be labeled. Follow our current convention and you can record info here https://wiki.pumpingstationone.org/Electrical ''Mostly done by Ron Bean - Still some odds and ends left (in particular, 3 outlet boxes near the front of the building).'' | + | * <strike>All electrical circuits need to be traced, all boxes should be labeled. Follow our current convention and you can record info here:</strike> [[Electrical]] <br> ''This is done now'' |
| | | |
− | === Security ===
| + | == Security == |
| * We have two front doors and two back doors, and the loading dock. Our current security system is 4 channel. We need (5 to) 8 channels to cover all 5 locations. (Ryan Pierce sez) | | * We have two front doors and two back doors, and the loading dock. Our current security system is 4 channel. We need (5 to) 8 channels to cover all 5 locations. (Ryan Pierce sez) |
| * Install security cameras above front and rear doors. Run wiring to furnace closet 2nd floor. Cameras and some wiring are said to exist. | | * Install security cameras above front and rear doors. Run wiring to furnace closet 2nd floor. Cameras and some wiring are said to exist. |
− | * Remove all other old cameras, they make some people grumpy. | + | * Remove all other old (unused) cameras, they make some people grumpy. <br>''Two removed, one left in loading dock. Any others?'' |
| | | |
| == HVAC == | | == HVAC == |
− | We need AC. Details to follow. | + | * Install ducting for Woodshop dust collection. |
| + | * Install dust collector. |
| + | * Install Hot Metals ventilation. |
| + | * We need AC. Details to follow. |
| | | |
| == Construction == | | == Construction == |
Line 23: |
Line 26: |
| * This one's a little more involved. Replace glass in front windows lounge 2.0. This might evolve into new hardware and maybe even into making new sashes. | | * This one's a little more involved. Replace glass in front windows lounge 2.0. This might evolve into new hardware and maybe even into making new sashes. |
| | | |
− | === Painting === | + | == Repairs == |
| + | * Fix leaking wall/ roof or create drainage. |
| + | |
| + | == Painting == |
| * Clean up, patch and paint where wall was removed in lounge 2.0. Tony left paint, under electrical panel, new space. ''(Do we need drywall work?)'' | | * Clean up, patch and paint where wall was removed in lounge 2.0. Tony left paint, under electrical panel, new space. ''(Do we need drywall work?)'' |
| | | |
| == Misc == | | == Misc == |
| * Install fire extinguishers and signs. They are said to exist. Upick locations, they can always be moved. I think some holders may need to be made or bought. Verify they are charged and tagged. This one applies to the entire space. | | * Install fire extinguishers and signs. They are said to exist. Upick locations, they can always be moved. I think some holders may need to be made or bought. Verify they are charged and tagged. This one applies to the entire space. |