Difference between revisions of "Ironworking Station maintenance"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 42: | Line 42: | ||
|Jan 11 2018 | |Jan 11 2018 | ||
|Tucker/Zlatan | |Tucker/Zlatan | ||
+ | |- | ||
+ | |x | ||
+ | |x | ||
+ | |Feb 8 2018 | ||
+ | |Tucker | ||
+ | |- | ||
+ | |x | ||
+ | |x | ||
+ | |Apr 5 2018 | ||
+ | |Tucker/Daniel | ||
+ | |- | ||
+ | |x | ||
+ | |x | ||
+ | |May 31 2018 | ||
+ | |Tucker/McTavish | ||
|- | |- | ||
|} | |} |
Latest revision as of 02:54, 1 June 2018
Maintenance for the Ironworking station is simple. On a monthly basis the varioaus tools should be inspected for damage, with particular attention payed to the blades. The pivots of the mechanisms should also periodically be oiled/greased to provide smooth operation. Both these tasks should be performed on a monthly basis. Failure to perform these maintenance tasks will result in degraded operation and premature wear of the tools. To perform maintenance on these tools please contact the owner: Tucker Tomlinson
maintenance log table
inspect for damage | lubricate if needed | date completed | person completing |
---|---|---|---|
monthly | monthly | ||
x | x | Aug3 2017 | Tucker/Miriam |
x | x | Sept7 2017 | Tucker/Miriam |
x | x | Oct5 2017 | Tucker |
x | x | Nov 9 2017 | Tucker |
x | x | Jan 11 2018 | Tucker/Zlatan |
x | x | Feb 8 2018 | Tucker |
x | x | Apr 5 2018 | Tucker/Daniel |
x | x | May 31 2018 | Tucker/McTavish |