August 2019--The core team (led by Zack Sasnow and a few others) are in the process of assembling the Grizzly DC. Need to lift the power head and put the cyclone and filters under it. Then comes building the ductwork that we measured and designed. And connecting the main tools. Erik is designing our tool racks and benches around that. We hope to be totally tidy in a month or two. | August 2019--The core team (led by Zack Sasnow and a few others) are in the process of assembling the Grizzly DC. Need to lift the power head and put the cyclone and filters under it. Then comes building the ductwork that we measured and designed. And connecting the main tools. Erik is designing our tool racks and benches around that. We hope to be totally tidy in a month or two. |