11/3/21 - Full turnup and test complete with H1 and C13 probes functional. Celebrations were had by drinking beer with the machine (beige box did partake), and relative quantification of ethanol vs water were undertaken with wobbly, but within an order-of-magnitude results. Further adventures planned...
+
<pre>
+
11/3/21 - Full turnup and test complete with H1 and C13 probes functional.
+
Celebrations were had by drinking beer with the machine (beige box did partake), and relative quantification of ethanol vs water were undertaken with wobbly, but within an order-of-magnitude results. Further adventures planned...