| |serial = 0003929870 | | |serial = 0003929870 |
| |arrived = Oct. 16, 2021 | | |arrived = Oct. 16, 2021 |
| + | |manual = https://wiki.pumpingstationone.org/images/SchultzMsw_60_max.pdf |
| |where = Boiler Room | | |where = Boiler Room |
| |doesitwork = yes | | |doesitwork = yes |
Line 16: |
Line 17: |
| The compressor is a two-stage machine rated for 40 cfm at 175 psi. It has a 120 gallon tank. It is fitted with a 10 hp 3-phase motor that is fed from PP1-7 (the safety switch in the Boiler Room), which is fed from a 3-phase 60 A breaker in PP1-1. Specified weight is 836 lbs. for the whole machine. | | The compressor is a two-stage machine rated for 40 cfm at 175 psi. It has a 120 gallon tank. It is fitted with a 10 hp 3-phase motor that is fed from PP1-7 (the safety switch in the Boiler Room), which is fed from a 3-phase 60 A breaker in PP1-1. Specified weight is 836 lbs. for the whole machine. |
| | | |
− | Air moves from the compressor through a shutoff valve to a filter and the to an air Dryer Atlas Copco model FD25 The manual is available[https://wiki.pumpingstationone.org/File:Airdryer.pdf right here.] | + | |
| + | |
| + | Air moves from the compressor through a shutoff valve to a filter and the to an air Dryer Atlas Copco model FD25 The manual is available[https://wiki.pumpingstationone.org/File:Airdryer.pdf right here.] |
| | | |
| From the dryer, air routes through a high efficiency filter and another shutoff valve. | | From the dryer, air routes through a high efficiency filter and another shutoff valve. |
Line 34: |
Line 37: |
| | | |
| == Maintenance == | | == Maintenance == |
− | (To be more filled in later).
| + | Manual is here in [https://wiki.pumpingstationone.org/images/SchultzMsw_60_max.pdf manual. ]pdf. Check oil frequently belts monthly and change oil every 200 hours. |
| | | |
| Responsibility for this mostly resides in the General Operations Team. Reminders are available via the PS1 maintenance calendar accessible by maintenance teams. | | Responsibility for this mostly resides in the General Operations Team. Reminders are available via the PS1 maintenance calendar accessible by maintenance teams. |
Line 56: |
Line 59: |
| -Check the pressure switch operation. | | -Check the pressure switch operation. |
| -Check for oil contamination and change it if necessary. | | -Check for oil contamination and change it if necessary. |
| + | -check and clean filters |
| | | |
| + | === Bimonthly === |
| | | |
− | === Quarterly===
| + | - change oil every 200 working hours or every other month.(Whichever occurs first). |
− | | |
− | -Change the air filter element every 300 working hours or quarterly.(Whichever occurs first). | |
| -Fasten bolts and nuts as required. | | -Fasten bolts and nuts as required. |
| -Change oil more frequently if compressor is located in a very dirty environment. | | -Change oil more frequently if compressor is located in a very dirty environment. |