Difference between revisions of "Kitchen Buildout Costs Vote"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
===History=== | ===History=== | ||
− | April 16, 2013 - | + | April 16, 2013 - Proposed |
===Language=== | ===Language=== |
Revision as of 02:59, 17 April 2013
This motion was proposed on April 16, 2013
Sponsor
Eric Stein
History
April 16, 2013 - Proposed
Language
Pumping Station: One will provide a budget of up to $970 to whomever purchases materials for and builds out kitchen walls for Pumping Station: One where the kitchen equipment is currently located, also enclosing the beer brewing equipment. This will not include electrical build out, which will be handled later once walls have been created to install electrical circuits in. The kitchen will be 13.5' x 32'.
Addendum
The plans are located at http://des.truct.org/forums/ps1_KITCHEN%202D.pdf - the eventual goal.
Vote
Yea: Nay: Present: