Difference between revisions of "Area Improvements and Projects"
Jump to navigation
Jump to search
Rtystgeeke (talk | contribs) |
|||
Line 1: | Line 1: | ||
==General Area== | ==General Area== | ||
*Paint the back stairwell railings, main doorways. | *Paint the back stairwell railings, main doorways. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
*Upgrade cable runs throughout the space to open cable raceways. | *Upgrade cable runs throughout the space to open cable raceways. | ||
− | |||
*Clean up/reorganize the safe. | *Clean up/reorganize the safe. | ||
Revision as of 14:47, 8 October 2017
General Area
- Paint the back stairwell railings, main doorways.
- Upgrade cable runs throughout the space to open cable raceways.
- Clean up/reorganize the safe.
CNC Area
- Move dust collection elbow so that it doesn't pass over the light in the shop, and the tube doesn't stretch to reach the home corner
- Put up Lexan sheet on the right side opening of the new desk.
- Build a spool rack that holds all filament spools above the 3D printers.
- Plane and glue 2 sheets of MDF to the Shopbot wasteboard .
- Crimp cables and metal tags/labels to all calipers
Electronics Area
Arts Area
Hot Metals Area
- Flip middle limbo wall to create storage for Hot Metals.
- Exhaust gas ventilation to outside.
- Acquire and install wall mounted compressed air hose real near and for use with the plasma cutter.
Cold Metals Area
- Emerson/Sears mini band saw
- Replace motor and pulley
- Fix switch
- Setup for cutting thing metal / tube stock etc
Wood Shop Area
- Add dust collection drop for new planer. May need to order elbows, 6" blast gate, 6" flanges.
- Add floor sweep inlet for the dust collector
Tool Cage Area
Kitchen Area
- Add sliding door to kitchen (check fire codes)
- Seal gap between catwalk and wall.