Line 18: |
Line 18: |
| * HVAC | | * HVAC |
| ** Install AC in new lounge. $300 | | ** Install AC in new lounge. $300 |
− | ** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Makeup air? Materials: ducting, elbows, hangers. $300 | + | ** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Makeup air? Materials: ducting, elbows, hangers. $400 |
− | ** Install ventilation duct, fan and hood for the kitchen. Use the duct currently used by the laser. $300 | + | ** Install ventilation duct, fan and hood for the kitchen. Use the duct currently used by the laser. $250 |
− | ** Install ventilation duct and fan for small metals (jewelry). $300 | + | ** Install ventilation duct and fan for small metals (jewelry). $250 |
| ** Move dust collection system for woodworking. Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. $900 | | ** Move dust collection system for woodworking. Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. $900 |
| ** Extend ventilation duct and add hood for hot metals. $400 | | ** Extend ventilation duct and add hood for hot metals. $400 |
Line 31: |
Line 31: |
| ** Install work sink at the top of the stairs next to upstairs bathroom. $300 | | ** Install work sink at the top of the stairs next to upstairs bathroom. $300 |
| ** Remove old sink in new lounge. | | ** Remove old sink in new lounge. |
− | ** Compressed air for the laser and hot metals. $300 | + | ** Compressed air lines for the laser and hot metals. $250 |
| | | |
| * Partition between hot metals and woodworking in 3515. | | * Partition between hot metals and woodworking in 3515. |
Line 52: |
Line 52: |
| *Fix roof leaks. | | *Fix roof leaks. |
| *Upgrade the lighting. | | *Upgrade the lighting. |
| + | |
| + | Sub total: $7750 |
| + | + 20% contingency funds |
| + | - $5000 already allocated |
| + | Total $4300 |
| | | |