| PS:1 will not be able to fit in its current space forever. Opinions on when the move should happen are varied, but we should enter any process well-informed and ready to make a good decision. | | PS:1 will not be able to fit in its current space forever. Opinions on when the move should happen are varied, but we should enter any process well-informed and ready to make a good decision. |
| | | |
| + | == The space == |
| + | * Industrial flex - commercial zoning or betterff |
| + | * 13,000 square feet as a minimum |
| + | * Existing office/lounge space is desirable. |
| + | ** If we book with a legitimate company, they may have available the services of an architect/planner and offer buildout as part of a lease |
| + | * |
| | | |
| == Location == | | == Location == |
Line 23: |
Line 29: |
| * Ample household circuits in all rooms - at least 2 20A circuits per room for lounge/classroom. 4 20A circuits for electronics. 8+ 20A circuits in shop, to be distributed by overhead cord reels, in addition to circuits for tools. | | * Ample household circuits in all rooms - at least 2 20A circuits per room for lounge/classroom. 4 20A circuits for electronics. 8+ 20A circuits in shop, to be distributed by overhead cord reels, in addition to circuits for tools. |
| * 3 phase is a must. Bonus points for disconnects in place around shop space | | * 3 phase is a must. Bonus points for disconnects in place around shop space |
− | * | + | * 400 amp service for the building |
− | | |
| | | |
| === Rooms === | | === Rooms === |
Line 30: |
Line 35: |
| * Shower in one of those bathrooms is a plus | | * Shower in one of those bathrooms is a plus |
| * A room to hold meetings/classes/lectures, separate from project working areas. | | * A room to hold meetings/classes/lectures, separate from project working areas. |
| + | * Small, offfice-like rooms for quiet workspace |
| | | |
| === Other utilities === | | === Other utilities === |
− | * Shop Air is a must. | + | * Existing shop air |
− | | + | * Existing dust/fume extraction and ventilation? Feasibility of install? |
| + | * |
| == Parking == | | == Parking == |
| + | * Free street parking has been sufficient in our current space |
| + | * If there's a lot on site, 15-20 spaces would probably be the minimum for usefulness (think events like LUG) |