Line 1: |
Line 1: |
− | [[2015_Budget_Vote | Back to 2015 Budget Vote]] | + | [[Category:Budget]] |
| + | [[2015 Budget Vote|Back to 2015 Budget Vote]] |
| | | |
| == Account Breakdown == | | == Account Breakdown == |
Line 73: |
Line 74: |
| |} | | |} |
| | | |
− | Total Budget Required: $ 6,731.00 | + | Total Budget Required: $ 6,731.00 |
| | | |
− | == Equipment == | + | == Equipment == |
| | | |
| {| class="wikitable" | | {| class="wikitable" |
Line 81: |
Line 82: |
| !Equipment Description | | !Equipment Description |
| !Annual Cost | | !Annual Cost |
− | !Monthly Cost
| |
| |---- | | |---- |
| |Wheel Truing Stand | | |Wheel Truing Stand |
| |For the Bike area to true bike wheels | | |For the Bike area to true bike wheels |
| |$350.00 | | |$350.00 |
− | |
| |
| |---- | | |---- |
| |Game things | | |Game things |
| |Buy systems that we have peripherals and games for, but the actual consoles missing, upgrade game library in general | | |Buy systems that we have peripherals and games for, but the actual consoles missing, upgrade game library in general |
| |$200.00 | | |$200.00 |
− | |
| |
| |---- | | |---- |
| |} | | |} |
| | | |
− | == Furniture == | + | == Furniture == |
| | | |
| {| class="wikitable" | | {| class="wikitable" |
Line 101: |
Line 99: |
| !Description | | !Description |
| !Annual Cost | | !Annual Cost |
− | !Monthly Cost
| |
| |---- | | |---- |
| |Tables | | |Tables |
| |New Tables for the lounge | | |New Tables for the lounge |
| |$300.00 | | |$300.00 |
− | |
| |
| |---- | | |---- |
| |} | | |} |
Line 116: |
Line 112: |
| !Item Description | | !Item Description |
| !Annual Cost | | !Annual Cost |
− | !Monthly Cost
| |
| |---- | | |---- |
| |Cabinet/Counter/Shelves | | |Cabinet/Counter/Shelves |
| |Materials to build those things to hold the analog and digital games of PS1. | | |Materials to build those things to hold the analog and digital games of PS1. |
| |$600.00 | | |$600.00 |
− | |
| |
| |---- | | |---- |
| |New Walls in the Lounge | | |New Walls in the Lounge |
| |New drywall to put over the currently bare cinder block walls. | | |New drywall to put over the currently bare cinder block walls. |
| |$1,100.00 | | |$1,100.00 |
− | |
| |
| |---- | | |---- |
| |} | | |} |
Line 155: |
Line 148: |
| |} | | |} |
| | | |
− | == Repair and Maintenance == | + | == Safety Equipment == |
| | | |
| {| class="wikitable" | | {| class="wikitable" |
− | !Repair Name | + | !Equipment Name |
− | !Repair Description | + | !Equipment Description |
| !Annual Cost | | !Annual Cost |
| !Monthly Cost | | !Monthly Cost |
| |---- | | |---- |
− | |General Repairs | + | |Cryo Gloves |
− | |Simple Repairs around the space that don't require a professional | + | |2 Pairs Cryo Gloves for handling liquid nitrogen |
− | |
| + | | $250.00 |
− | | $ 60.00
| + | | |
− | |----
| |
− | |Vacuum Pump Oil
| |
− | |4x 1L bottles Edwards Ultragrade 19, needed in 4Q 2015
| |
− | | $ 150.00
| |
− | |
| |
− | |----
| |
− | |Vacuum Pump Oil Odor Filters
| |
− | |5x Carbon Odor Filters, needed in 4Q 2015
| |
− | | $ 150.00 | |
− | | | |
| |---- | | |---- |
| |} | | |} |