The DC will be located where the plywood rack currently is, and the plywood rack, ShopBot desk, and computer shelves will need to be moved to the left. This will require a three-phase 220V 50A hookup to be installed in the new location. | The DC will be located where the plywood rack currently is, and the plywood rack, ShopBot desk, and computer shelves will need to be moved to the left. This will require a three-phase 220V 50A hookup to be installed in the new location. |