Anonymous

Changes

From Pumping Station One
247 bytes removed ,  18:56, 11 May 2011
no edit summary
Line 28: Line 28:  
In the event that the Area Manager does not perform the duties to the satisfaction of the membership and/or the BoD, the BoD reserves the right to remove the person from their position as Area Manager. At that time, the BoD may vote in a new volunteer for the role.
 
In the event that the Area Manager does not perform the duties to the satisfaction of the membership and/or the BoD, the BoD reserves the right to remove the person from their position as Area Manager. At that time, the BoD may vote in a new volunteer for the role.
    +
In the event that a new area and Area Manager role is deemed necessary, the area and role can be defined and voted in by the membership as an amendment to this proposal.
    +
At this time, some suggested areas within Pumping Station: One that would be eligible for Area Managers are the:
   −
At this time, the areas within Pumping Station: One that are eligible for Area Managers are the:
+
*Electronics shop (under the loft)
 
+
*Wood/Metal shop (in the back garage)
*Electronics shop
+
*Craft area (outside wall of the loft)
**This includes all tools and materials within the area beneath the loft.
+
*General area (shared spaces, classroom, loft, and main room)
 
  −
*Wood/Metal shop
  −
**This includes all tools and materials within the room beside the rear garage.
  −
 
  −
*Craft area
  −
**This involves all tools and materials within the (new) craft area along the outer loft wall.
     −
*General area
  −
**This involves the general use areas within the Main Room, as well as the shared front area, the loft, and the classroom.
  −
  −
In the event that a new area and Area Manager role is deemed necessary, the area and role can be defined and voted in by the membership as an amendment to this proposal.
      
===Vote===
 
===Vote===
    
===Passed===
 
===Passed===
Cookies help us deliver our services. By using our services, you agree to our use of cookies.