   Line 36: Line 36:  
* tool certification should be moved to the backburner
 
* tool certification should be moved to the backburner
 
* Welding area is coming along decently, equipment and infrastructure is being completed
 
* Welding area is coming along decently, equipment and infrastructure is being completed
** Power is blocking completion. Need to run 220 and 120.
+
** Power is blocking completion. Need to run 220 and 120.
 
* Shellie needs blog and calendar access
 
* Shellie needs blog and calendar access
* hot metal should be split from machining. Later.
+
* hot metal should be split from machining. Later.