Line 28: Line 28:
  
 
==Wood Shop Area==
 
==Wood Shop Area==
*Add dust collection drop for new planer.  May need to order elbows, 6" blast gate, 6" flanges.
+
*Add dust collection inlets for unconnected machines
*Add floor sweep inlet for the dust collector
+
*Build manifold to small duct collector for sanding station
 +
*Build Chopsaw table.
 +
*Add floor sweep inlet for the dust collector.
  
 
==Tool Cage Area==
 
==Tool Cage Area==

Revision as of 14:55, 8 October 2017

General Area

  • Paint the back stairwell railings, main doorways.
  • Upgrade cable runs throughout the space to open cable raceways.
  • Clean up/reorganize the safe.

CNC Area

  • Crimp cables and metal tags/labels to all calipers
  • Clean and lubricate the Shopbot guide rails
  • Clean and lubricate CNC Plasma cutter rails
  • Stiffen CNC plasma cutter
  • Add z probe to CNC plasma cutter

Electronics Area

  • Clean whiteboard paint wall
  • Hang large sheets of showerboard to the CNC wall

Arts Area

Hot Metals Area

  • Exhaust gas ventilation to outside for plasma cutter and welders.
  • Sweep!

Cold Metals Area

  • Emerson/Sears mini band saw
    • Replace motor and pulley
    • Fix switch
    • Setup for cutting thing metal / tube stock etc

Wood Shop Area

  • Add dust collection inlets for unconnected machines
  • Build manifold to small duct collector for sanding station
  • Build Chopsaw table.
  • Add floor sweep inlet for the dust collector.

Tool Cage Area

Kitchen Area

  • Add sliding door to kitchen (check fire codes)
  • Seal gap between catwalk and wall.