Changes

Jump to navigation Jump to search
no edit summary
Line 39: Line 39:  
# Secure Mold to Vacuum table
 
# Secure Mold to Vacuum table
 
# Check seals around material and mold
 
# Check seals around material and mold
# Turn on Wall Power
+
# Turn on Wall Power [[File:Bvf main power.jpg|300px]]
# Turn on Machine Power
+
# Turn on Machine Power [[File:Bvf machine power.jpg|300px]]
 
# Select Number of Heating Elements
 
# Select Number of Heating Elements
 
# Select Duty Cycle
 
# Select Duty Cycle
 
# Connect Pneumatic Hose. It can be borrowed from the CNC Plasma Cutter, if not in use.
 
# Connect Pneumatic Hose. It can be borrowed from the CNC Plasma Cutter, if not in use.
# Turn on Heating Element
+
# Turn on Heating Element [[File:Bvf control panel.jpeg|300px]]
 
# Move material frame into heater
 
# Move material frame into heater
 
# Close Vacuum Valve
 
# Close Vacuum Valve
# Turn on Vacuum Pump
+
# Turn on pump, to begin to build vacuum [[File:Bvf control panel.jpeg|300px]]
# Visually check if material is sagging and ready
+
# Visually check if heating element is on and if material is warming [[File:Bvf heat 1.jpg|300px]]
 +
# Visually check if material is sagging and ready [[File:Bvf heat 2.jpg|300px]]
 
# Pull Material frame forward
 
# Pull Material frame forward
 
# Inspect Plastic is ready
 
# Inspect Plastic is ready
150

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu