Line 1: |
Line 1: |
| {{Board Meeting Notes | | {{Board Meeting Notes |
− | | Previous MM-DD-YYYY=08-28-2012 | + | | Previous YYYY-MM-DD=2012-08-28 |
| | Current YY-MM-DD=09-04-2012 | | | Current YY-MM-DD=09-04-2012 |
− | | Next MM-DD-YYYY=09-11-2012 | + | | Next YYYY-MM-DD=2012-09-11 |
| | YYYY=2012}} | | | YYYY=2012}} |
| | | |
− | Meeting start: 7:12 pm | + | Meeting start: 7:12 pm |
| | | |
− | ===Attendance=== | + | === Attendance === |
| | | |
| * Tim | | * Tim |
Line 15: |
Line 15: |
| * Shawn | | * Shawn |
| | | |
− | ===Agenda=== | + | === Agenda === |
| | | |
− | ====Old Business==== | + | ==== Old Business ==== |
| | | |
| * Ishmael | | * Ishmael |
Line 25: |
Line 25: |
| * Tim | | * Tim |
| ** inventory and ownership status of old landlord's stuff left on our side. - NO inventory yet | | ** inventory and ownership status of old landlord's stuff left on our side. - NO inventory yet |
− | ** Status of money owed by the old landlord? (Steve's letter formally asking for the deposit back) | + | ** Status of money owed by the old landlord? (Steve's letter formally asking for the deposit back) |
| | | |
| * Patrick | | * Patrick |
Line 38: |
Line 38: |
| ** Install shop air valve between our area and Tony's | | ** Install shop air valve between our area and Tony's |
| | | |
− | ====New Business==== | + | ==== New Business ==== |
| | | |
| * Financial/membership report | | * Financial/membership report |
| | | |
− | ===Minutes=== | + | === Minutes === |
| | | |
− | * Waste management has been paid. Ishmael, are we closer to the paid payment or the next payment? | + | * Waste management has been paid. Ishmael, are we closer to the paid payment or the next payment? |
| * Ishmael will buy the access control parts for Rhys. | | * Ishmael will buy the access control parts for Rhys. |
| * No inventory yet | | * No inventory yet |
| * No letter for the security deposit at 3354 | | * No letter for the security deposit at 3354 |
− | * Cleaning service is scheduled, one time for now. Can schedule repeating in the future. | + | * Cleaning service is scheduled, one time for now. Can schedule repeating in the future. |
| * We decided that Shellie is the new arts area host | | * We decided that Shellie is the new arts area host |
| * splitting the shop air is Dan's todo. | | * splitting the shop air is Dan's todo. |
| * the big compressor is running and in the boiler room. | | * the big compressor is running and in the boiler room. |
| | | |
| + | * Members: 151 |
| + | * Starving Members: 82 |
| + | * Full Members: 69 |
| + | * Friends of PS1: 2 |
| | | |
| * build out | | * build out |
Line 61: |
Line 65: |
| *** Lighting | | *** Lighting |
| *** Separate the kitchen and cnc tools. | | *** Separate the kitchen and cnc tools. |
− | ** Separating the wood and metal shops are less pressing, not sure how to evaluate how much space it needs permanently. | + | ** Separating the wood and metal shops are less pressing, not sure how to evaluate how much space it needs permanently. |
| ** Designate spots for everything in the shop before any major build out | | ** Designate spots for everything in the shop before any major build out |
| | | |
| | | |
− | Meeting End: XX:XX pm | + | Meeting End: XX:XX pm |