Anonymous

Changes

From Pumping Station One
m
Robot: Automated text replacement (-(\w+) MM-DD-YYYY=(\d{2})-(\d{2})-(\d{4}) +\1 YYYY-MM-DD=\4-\2-\3)
Line 1: Line 1:  
{{Board Meeting Notes  
 
{{Board Meeting Notes  
| Previous MM-DD-YYYY=09-11-2012
+
| Previous YYYY-MM-DD=2012-09-11
 
| Current YY-MM-DD=09-18-2012  
 
| Current YY-MM-DD=09-18-2012  
| Next MM-DD-YYYY=09-25-2012
+
| Next YYYY-MM-DD=2012-09-25  
 
  | YYYY=2012}}
 
  | YYYY=2012}}
   −
Meeting start: XX:XX pm
+
Meeting start: 07:06 pm
   −
===Attendance===
+
=== Attendance ===
   −
*  
+
* Tim Saylor
 +
* Patrick Callahan
 +
* Shawn Blaszak
 +
* Ishmael Rufus
 +
* Eric Stein
   −
===Agenda===
+
=== Agenda ===
 
   
 
   
====Old Business====
+
==== Old Business ====
    
* Ishmael
 
* Ishmael
Line 21: Line 25:  
* Tim
 
* Tim
 
** inventory and ownership status of old landlord's stuff left on our side.
 
** inventory and ownership status of old landlord's stuff left on our side.
** Status of money owed by the old landlord? (Steve's letter formally asking for the deposit back)
+
** Status of money owed by the old landlord? (Steve's letter formally asking for the deposit back)
 
** Bill-of-materials for the workshop build-out
 
** Bill-of-materials for the workshop build-out
   Line 29: Line 33:  
* Dan
 
* Dan
 
** Install shop air valve between our area and Tony's and attach our compressor to the system.
 
** Install shop air valve between our area and Tony's and attach our compressor to the system.
 +
 +
* Steve
 +
** We need some replacement part for the laser cutter. (a belt and the auto-focus spring)
    
* Shawn
 
* Shawn
Line 34: Line 41:  
* Unassigned
 
* Unassigned
 
** Change address update.
 
** Change address update.
** We need some replacement part for the laser cutter. (a belt and the auto-focus spring)
   
** We need to verify the code status of the fire door in the metal shop
 
** We need to verify the code status of the fire door in the metal shop
 
** We need to improve our implementation of the tool certification process.
 
** We need to improve our implementation of the tool certification process.
** TIG welder is coming in soon
  −
** Donation of oxyacetylene torch setup and tanks (welding and cutting) ?
     −
====New Business====
+
==== New Business ====
    
* Financial/membership report
 
* Financial/membership report
 +
* TIG welder is coming in soon
 +
* Donation of oxyacetylene torch setup and tanks (welding and cutting) ?
   −
===Minutes===
+
=== Minutes ===
    +
* The entry system equipment has been ordered to be delivered to Rhys
 +
* The second electric bill has been paid.
 +
* Steve has written the letter to the old landlord demanding our safety deposit
 +
* The cleaning service showed up before their scheduled time and we missed them.
 +
** Patrick won't be available for the next two weekends.
 +
** Patrick will ask Geoffrey if he can be here to let them in.
 +
* Dan tried contacting Tony about installing an air valve in the shopair system but hasn't heard back from him.
 +
* Steve was going to purchase parts for the laser cutter but is not here right now.
 +
* Membership Report -
 +
** Full: 70
 +
** Starving: 83
 +
** Friends of PS1: 2
 +
* Ishmael gave the financial report
 +
* Jeremy will be bringing in a TIG welder soon
 +
** We may, also, be getting a donation of Oxy/Acetelene equipment.
 +
* The Power Wheels guys will keep an eye out for the missing Weller soldering iron in case it was put in the Maker Faire Evanston supplies.
 
   
 
   
Meeting End: XX:XX pm
+
Meeting End: 07:35 pm
WikiBots
1,397

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.