Anonymous

Changes

From Pumping Station One
Line 58: Line 58:  
GENERAL OPERATIONS:  
 
GENERAL OPERATIONS:  
   −
- No update yet on the roof. Andrew Morris has yet to receive a call back from the roofer.
+
  - No update yet on the roof. Andrew Morris has yet to receive a call back from the roofer.
   −
- Andrew Morris noticed the Wood Shop boiler was not venting properly. He attempted to fix the problem with the draft, but is still not 100% sure if it is venting into the building.  
+
  - Andrew Morris noticed the Wood Shop boiler was not venting properly. He attempted to fix the problem with the draft, but is still not 100% sure if it is venting into the building.  
   −
- Electronics lights are in rough shape. There are approximately only three fixtures working in the electronics area. It is probably time to convert them to LEDs as was (mostly) done in General.
+
  - Electronics lights are in rough shape. There are approximately only three fixtures working in the electronics area. It is probably time to convert them to LEDs as was (mostly) done in General.
   −
- Lockout-tagout stations are hung and stocked. We’ll need to come up with communication about using those.
+
  - Lockout-tagout stations are hung and stocked. We’ll need to come up with communication about using those.
   −
- Andrew Morris is in the process of drafting a hazardous materials policy for future comment and discussion. No timeline on set on the completion of this policy.
+
  - Andrew Morris is in the process of drafting a hazardous materials policy for future comment and discussion. No timeline on set on the completion of this policy.
    
TECH TEAM:
 
TECH TEAM:
Cookies help us deliver our services. By using our services, you agree to our use of cookies.