Difference between revisions of "Boice Crane Drill Press maintenance"
Jump to navigation
Jump to search
(Created page with "The Boice Crane drill press requires regular oiling of the gears and spindle (weekly or before each use, whichever is less frequent). The chuck (if...") |
m (add category) |
||
Line 1: | Line 1: | ||
+ | [[Category:EquipmentMaintenance]] | ||
+ | |||
The [[Boice_Crane_Drill_Press|Boice Crane drill press]] requires regular oiling of the gears and spindle (weekly or before each use, whichever is less frequent). The chuck (if present) should periodically be checked for runout (monthly) and the arbor or chuck body replaced if notable runout is present. | The [[Boice_Crane_Drill_Press|Boice Crane drill press]] requires regular oiling of the gears and spindle (weekly or before each use, whichever is less frequent). The chuck (if present) should periodically be checked for runout (monthly) and the arbor or chuck body replaced if notable runout is present. | ||
Latest revision as of 17:40, 11 April 2018
The Boice Crane drill press requires regular oiling of the gears and spindle (weekly or before each use, whichever is less frequent). The chuck (if present) should periodically be checked for runout (monthly) and the arbor or chuck body replaced if notable runout is present.
Boice Crane Drill Press maintenance log table
oil spindle | oil gears | wax table | person completing | date completed |
---|---|---|---|---|
weekly | monthly | monthly | ||