Line 39: Line 39:     
== Open Issues ==
 
== Open Issues ==
 
+
'''Mechanical'''
Find a process for backing up and restoring system parameters.
  −
 
   
A replacement cover for the variable speed drive is partially installed. We need to remove the cover and replace two alignment pins, then adjust the Reeves drive.
 
A replacement cover for the variable speed drive is partially installed. We need to remove the cover and replace two alignment pins, then adjust the Reeves drive.
  −
The machine was wired at the factory for 460 volt 3 phase and we use 230 volt 3 phase in our shop. Ed and Dean rewired the motor and controller box, in a temporary fashion, to use 230v. It is currently using a 460 to 230 volt transformer, which will eventually be removed.
      
A draw bar should arrive from Kurt around 4/21.  It will need to be machined to length and drilled for a pin.
 
A draw bar should arrive from Kurt around 4/21.  It will need to be machined to length and drilled for a pin.
   −
The Kurt power draw bar has to be installed.
+
The Kurt power draw bar has to be installed.  
    
X, Y and Z limit switches need to be adjusted.
 
X, Y and Z limit switches need to be adjusted.
Line 56: Line 52:  
Y axis ball screw cover is bent and not sliding properly. It should be removed and replaced (or bent straight). Removal is difficult because it is bent. This could require removing the table, which is heavy.
 
Y axis ball screw cover is bent and not sliding properly. It should be removed and replaced (or bent straight). Removal is difficult because it is bent. This could require removing the table, which is heavy.
   −
Order a computer for design work and to drip G code to the Heidenhain.
+
check the BP maintenance manual for other adjustments that are required.
 +
 
 +
'''Software'''
 +
Find a process for backing up and restoring system parameters.
    
Figure out how to drip code to the Heidenhain (Ed).
 
Figure out how to drip code to the Heidenhain (Ed).
   −
Move the automated lube system power back to the relay in the control cabinet.  It is currently powered through a separate 110 v cord.  
+
Set up the tool chain.
 +
 
 +
'''Electrical'''
   −
Set up the tool chain.
+
The machine was wired at the factory for 460 volt 3 phase and we use 230 volt 3 phase in our shop. Ed and Dean rewired the motor and controller box, in a temporary fashion, to use 230v. It is currently using a 460 to 230 volt transformer, which will eventually be removed.
 +
 
 +
Move the automated lube system power back to the relay in the control cabinet.  It is currently powered through a separate 110 v cord.
   −
check the BP maintenance manual for other adjustments that are required.
+
'''Purchase'''
 +
Computer for design work and to drip G code to the Heidenhain. We already have a monitor.
   −
Find an NMTB 30 drill chuck.
+
NMTB 30 drill chuck
   −
Find a vise.
+
Vise.
    +
'''Miscellaneous'''
 
Clean up the BP service manual scans and add the document to the wiki.
 
Clean up the BP service manual scans and add the document to the wiki.
  